SL.No | ProjectName | Mega | Circle | Division | District | Scheme | Subscheme |
1
| Construction of HLRCC bridge with Land acquisition ,approach road and protection work near naiyam gram at pachphutiya ghat in Bagmati river (7x24.75 m) Hari Construction & Associate Pvt. Ltd., Begusarai | Non-Mega | Work Circle-2 | Darbhanga | Darbhanga | BDF | |
2
| Construction of HL RCC bridge (4x14.50M) Ujjan PWD Road in Ghanshyampur Kathbara-Lagma Kkora Mcheta-Lalpatti Road of 11.10 KM in (4x14.50 m) the District of Darbhanga. Royal Engineers. | Non-Mega | Work Circle-2 | Darbhanga | Darbhanga | FDR | N/A |
3
| Construction of HL RCC bridge (4X18.75M) in 15 Km of Bathiya-Narayanpur- Kakodha-Devena-Rajkharwar with approach road, Diversion work and Miscellaneous work in the District of Darbhanga.(Laxman Kumar,09006276101) | Non-Mega | Work Circle-2 | Darbhanga | Darbhanga | FDR | N/A |
4
| Construction of HL RCC bridge (6x14.50M) at Shivnagar Ghat in 11.50KM of Ghanshyampur- Rasiyari Road with approach road, Diversion work and Miscellaneous work in the District of Darbhanga. | Non-Mega | Work Circle-2 | Darbhanga | Darbhanga | FDR | N/A |
5
| Construction of HL RCC bridge(4x14.50M) Ujjan PWD Road in Ghanshyampur Kathbara-Lagma Kkora Macheta-Lalpatti Road of 12.10 KM in the District of Darbhanga. | Non-Mega | Work Circle-2 | Darbhanga | Darbhanga | FDR | N/A |
6
| Construction of HL RCC bridge(2x16.50M) in 1st km of Bishanpur Atarbel Road in the District of Darbhanga. | Non-Mega | Work Circle-2 | Darbhanga | Darbhanga | FDR | N/A |
7
| costruction of HLRCC bridge near chandanpatti village (2 x 18.75 m) M/S Sanjay Kumar Singh, 9470624199 | Non-Mega | Work Circle-2 | Darbhanga | Darbhanga | MMSNY | N/A |
8
| Construction of HLRCC bridge with Land acquisition ,approach road and protection work in the 18th k.m of baliya- kakodha -dewana-rajkherwar -jhanjharpur road(upto NH-57 in drabhanga distrcit(12x24.75 m)Shiv Kishore Construction Pvt. Ltd.,9431858543 RCD | Non-Mega | Work Circle-2 | Darbhanga | Darbhanga | Plan | N/A |
9
| costruction of HLRCC bridge at damla ghat in bisfi block (3x21.75 m) Sri Krishna Kant Thakur,9430897941 | Non-Mega | Work Circle-2 | Darbhanga | Madhubani | MMSNY | |
10
| Construction of 4x22.00m span H.L. R.C.C. Bridge over Retva River in P.W.D. Nehru Chowk to Dharamganj Road of Araria District. S.K. Construction | Non-Mega | Work Circle-2 | Katihar | Araria | MMSNY | N/A |
11
| Construction of 3x21.75m span R.C.C. Bridge over Dhiwha (Chakka) dhar in front of Yogipur in farhi to kanholi Road of Narpatganj block in the District of Araria District. (Balance Work) Bipin Kr. Singh | Non-Mega | Work Circle-2 | Katihar | Araria | MMSNY | |
12
| Construction of HL RCC bridge in Rampatti-Batlohia Road in 5th KM (5x16.00M) in the District of Madhubani. | Non-Mega | Work Circle-2 | Darbhanga | Madhubani | Plan | N/A |
13
| Construction of 4x21.75m span R.C.C. Bridge over Adiwashi Tola in Dumariya to Rampur Road of Palasi Panchayat in the District of Araria District. Pankaj Kumar | Non-Mega | Work Circle-2 | Katihar | Araria | MMSNY | N/A |
14
| costruction of HLRCC bridge in near proposed bypass road of hasanpur bazar at marachi ujagar of virpur bramhsthan in hasanpur block(3x18.75 m) Praveez Khan | Non-Mega | Work Circle-2 | Darbhanga | Samastipur | MMSNY | N/A |
15
| Construction of 2x16.50m R.C.C. Bridge over Kathliya Kochpara Dhar in Kishanganj Block in the District of Kishanganj. [Star Construction] | Non-Mega | Work Circle-2 | External Division-2 (Kishanganj) | Kishanganj | MMSNY | N/A |
16
| Construction of HLRCC bridge at angar ghat in the budhi gandak river (10x24.75 m) Braj Kishor Rai,9430800861 | Non-Mega | Work Circle-2 | Darbhanga | Samastipur | Nabard | |
17
| Construction of H.L. R.C.C. bridge (3x16.00m) including approach road, diversion and protection work in place of damaged road in 9th km of Mastan chowk-Bagalbari-Rahamatpara-Alta-Barbatta road in the district of Kishanganj. [Bidyanand Gupta] | Non-Mega | Work Circle-2 | External Division-2 (Kishanganj) | Kishanganj | FDR | N/A |
18
| Construction of H.L. RCC bridge (4X16.00 m) in 11th km. of Bahadurganj-Tedhagach road in the District of Kishanganj. [Binod Kumar Singh] | Non-Mega | Work Circle-2 | External Division-2 (Kishanganj) | Kishanganj | FDR | N/A |
19
| Construction of HLRCC bridge at kakar ghat in rosra morwara road in kareh river(16x24.75 m) Shiv Kishore Construction Pvt. Ltd.,9431858543 | Non-Mega | Work Circle-2 | Darbhanga | Samastipur | Nabard | |
20
| Construction of HLRCC bridge with Land acquisition ,approach road and protection work in kareh river between hasanpur to soharwa sati ghat in samastipur distrcit(21x24.00 m)Ram Kripal Singh Constructon Pvt Ltd., RCD | Non-Mega | Work Circle-2 | Darbhanga | Samastipur | Plan | |
21
| Construction of HL RCC bridge in Tajpur-Halai Road in 14th KM of Noon River (5x21.75M) in the District of Samastipur | Non-Mega | Work Circle-2 | Darbhanga | Samastipur | Plan | N/A |
22
| Construction of of H.L. RCC bridge (5X16.00 m) in 6th km. of Kishanganj-Bahadurganj road under FDR in the District of Kishanganj. [Balram Singh] | Non-Mega | Work Circle-2 | External Division-2 (Kishanganj) | Kishanganj | FDR | N/A |
23
| Construction of 3x21.75m span R.C.C. Bridge over Jahanpur Ghat in the District of Araria District. Pankaj Kumar | Non-Mega | Work Circle-2 | Katihar | Araria | MMSNY | N/A |
24
| Construction of HL RCC bridge in 3rd km of (5x16.50M) Bindha gama Chaksaho Road in the District of Samastipur. | Non-Mega | Work Circle-2 | Darbhanga | Samastipur | FDR | |
25
| Construction of HL RCC bridge (2x16.00m) including approach road, diversion and protection work in place of damaged road by flood in 2017 in the 13th km of Mastan chowk-Bagalbari-Rahamatpara-Alta-Barbatta road in the district of Kishanganj. [Tirupati Balajee Earth Work Pvt. Ltd.] | Non-Mega | Work Circle-2 | External Division-2 (Kishanganj) | Kishanganj | FDR | N/A |
26
| Construction of HLRCC bridge in Indo -Nepal border road at channage 31.032 km in the district of Purvi champaran Package No- 7 (1 x 40 M),Barhonia engicor Pvt ltd,9431269809 | Non-Mega | Work Circle-1 | Champaran(Motihari) | East Champaran(Motihari) | Nabard | N/A |
27
| Construction of HLRCC bridge in Indo -Nepal border road at channage 31.768 km in the district of Purvi champaran Package No- 7 (1 x 15M),Barhonia engicor Pvt ltd,9431269809 | Non-Mega | Work Circle-1 | Champaran(Motihari) | East Champaran(Motihari) | Nabard | |
28
| Construction of HLRCC bridge in Indo -Nepal border road at channage 32.875 km in the district of Purvi champaran Package No- 7 (2 x 35M),Barhonia engicor Pvt ltd,9431269809 | Non-Mega | Work Circle-1 | Champaran(Motihari) | East Champaran(Motihari) | Nabard | N/A |
29
| Construction of HLRCC bridge in Indo -Nepal border road at channage 33.900 km in the district of Purvi champaran Package No- 7 (1 x 30M),Barhonia engicor Pvt ltd,9431269809 | Non-Mega | Work Circle-1 | Champaran(Motihari) | East Champaran(Motihari) | Nabard | |
30
| Construction of HLRCC bridge in Indo -Nepal border road at channage 35.650 km in the district of Purvi champaran Package No- 7 (2 x 35M),Barhonia engicor Pvt ltd,9431269809 | Non-Mega | Work Circle-1 | Champaran(Motihari) | East Champaran(Motihari) | Nabard | N/A |
31
| Construction of HLRCC bridge in Indo -Nepal border road at channage 36.858 km in the district of Purvi champaran Package No- 7 (2 x 25M),Barhonia engicor Pvt ltd,9431269809 | Non-Mega | Work Circle-1 | Champaran(Motihari) | East Champaran(Motihari) | Nabard | N/A |
32
| Construction of R.C.C H.L Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-17.875) 1x6.00m District of Sitamarhi. | Non-Mega | Work Circle-1 | Muzaffarpur | Sitamarhi | Nabard | RIDF-18 (RCD) |
33
| Construction of of H.L. RCC bridge (3X18.75 m) in Place of Damaged by flood in 2017 in the 4th km. of Araria Meerganj Chowk Kuwari Bypass Skiti Dhabeli road under in the District Araria. RAJ KISHOR SINGH, ARARIA | Non-Mega | Work Circle-2 | Katihar | Araria | FDR | N/A |
34
| Construction of HLRCC bridge in Indo -Nepal border road at channage 40.772 km in the district of Purvi champaran Package No- 7 (2 x 30M),Barhonia engicor Pvt ltd,9431269809 | Non-Mega | Work Circle-1 | Champaran(Motihari) | East Champaran(Motihari) | Nabard | N/A |
35
| Construction of of H.L. RCC bridge (2X16.00 m) in Place of Damaged by flood in 2017 in the 9th Km of Bairagachi-Banglacol road in the District of Araria. MS SONA CONSTRUCTION, SUPAUL | Non-Mega | Work Circle-2 | Katihar | Araria | FDR | N/A |
36
| Construction of R.C.C H.L Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-19.265) 2x18.00m District of Sitamarhi. | Non-Mega | Work Circle-1 | Muzaffarpur | Sitamarhi | Nabard | N/A |
37
| Construction of HLRCC bridge in Indo -Nepal border road at channage 41.258 km in the district of Purvi champaran Package No- 7 (1 x 40M),Barhonia engicor Pvt ltd,9431269809 | Non-Mega | Work Circle-1 | Champaran(Motihari) | East Champaran(Motihari) | Nabard | N/A |
38
| Construction of of H.L. RCC bridge (3X18.75 m) in 3rd km. of Araria Meerganj Chowk Kuwari Bypass Skiti Dhabeli road under FDR in the District ofAraria. SHIV CHANDRA KUMAR | Non-Mega | Work Circle-2 | Katihar | Araria | FDR | N/A |
39
| Construction of R.C.C H.L Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-23.843) 2x18.00m District of Sitamarhi. | Non-Mega | Work Circle-1 | Muzaffarpur | Sitamarhi | Nabard | RIDF-18 (RCD) |
40
| Construction of HLRCC bridge in Indo -Nepal border road at channage 105.640 km in the district of Purvi champaran Package No-10 (3 x 8M),Barhonia engicor Pvt ltd,9431269809 | Non-Mega | Work Circle-1 | Champaran(Motihari) | East Champaran(Motihari) | Nabard | N/A |
41
| Construction of of H.L. RCC bridge (3X18.00 m) in Place of Damaged by flood in 2017 in the 70th Km of Refugee colony to Mirganj Chowk (NH57A) road in the District of Araria. BIPIN KUMAR, KATIHAR | Non-Mega | Work Circle-2 | Katihar | Araria | FDR | N/A |
42
| Construction of R.C.C H.L Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-26.487) 2x25.00m District of Sitamarhi. | Non-Mega | Work Circle-1 | Muzaffarpur | Sitamarhi | Nabard | RIDF-18 (RCD) |
43
| Construction of HLRCC bridge with approach road at kataha ghat in sikrahna river under mehsi block in the district of East champaran(12 x 24.750 M), Well foundation. M/S Jay shankar rai,9934867236 | Non-Mega | Work Circle-1 | Champaran(Motihari) | East Champaran(Motihari) | Nabard | N/A |
44
| Construction of of H.L. RCC bridge (3X18.00 m) including approach road, diversion and protection work in place of damaged by flood in 2017 in the ch. Ch. 9th Km of Meerganj-Kuwari by pass- sikti- Dhabeli road in the distric of Araria. M/S JAI MATA DI CONST. BEGUSARAI. | Non-Mega | Work Circle-2 | Katihar | Araria | FDR | N/A |
45
| Construction of R.C.C H.L Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-35.737) 1x6.00m District of Sitamarhi. | Non-Mega | Work Circle-1 | Muzaffarpur | Sitamarhi | Nabard | RIDF-18 (RCD) |
46
| Construction of of H.L. RCC bridge (3X12.00 m) including approach road, diversion and protection work in place of damaged by flood in 2017 in the ch. Ch. 7th Km of Araria Kurshakatta road in the distric of Araria. TIRUPATI BALAJI EARTH WORK PVT LTD. PATNA | Non-Mega | Work Circle-2 | Katihar | Araria | FDR | N/A |
47
| Construction of 5x21.75 m H.L. R..C.C. Bridge with Approach Road, Safety work, Diversion work and Misclaneous work in 5th km. of Sugauli - Piparpati Road in East Champaran. | Non-Mega | Work Circle-1 | Champaran(Motihari) | East Champaran(Motihari) | FDR | N/A |
48
| Construction of R.C.C H.L Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-47.887) 2x6.00m District of Sitamarhi. | Non-Mega | Work Circle-1 | Muzaffarpur | Sitamarhi | Nabard | RIDF-18 (RCD) |
49
| Construction of R.C.C H.L Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-48.720) 2x6.00m District of Sitamarhi. | Non-Mega | Work Circle-1 | Muzaffarpur | Sitamarhi | Nabard | RIDF-18 (RCD) |
50
| Construction of H.L.R.C.C. Bridge in Anjankot and Bharkurwa Ghat over Bhudhi Gandak River under Motipur in the district of Muzaffarpur. (Nabard) | Non-Mega | Work Circle-1 | Muzaffarpur | Muzaffarpur | Nabard | N/A |
51
| Construction of H.L.R.C.C. Bridge in Muzaffarpur deoria road 20/2 over Nundhar river with approach road in the district of Muzaffarpur. (Nabard) | Non-Mega | Work Circle-1 | Muzaffarpur | Muzaffarpur | Nabard | N/A |
52
| Construction of H.L.R.C.C. Brige in 10th km of Maksudpur in the district of Muzaffarpur. (Plan) | Non-Mega | Work Circle-1 | Muzaffarpur | Muzaffarpur | MMSNY | N/A |
53
| Construction of H.L.R.C.C. Bridge in Raghai ghat over Bhudhi Gandak river in the district of Muzaffarpur. (Plan) | Non-Mega | Work Circle-1 | Muzaffarpur | Muzaffarpur | Plan | N/A |
54
| Construction of 2x10.50 m H.L. R..C.C. Bridge with Approach Road, Safety work, Diversion work and Misclaneous work in 11th km. of Dhaka - Phulwariya Road in East Champaran. Pile Foundation. M/S Royal Engineers | Non-Mega | Work Circle-1 | Champaran(Motihari) | East Champaran(Motihari) | FDR | N/A |
55
| Construction of HL RCC bridge 8x24.75 M ON Harohar river in Pali village at Barahiya block in Lakhisarai District. Royal Associate. Mob.-9431211283 | Non-Mega | Work Circle-2 | Nalanda | Lakhisarai | Nabard | N/A |
56
| Construction of 2x16.50 m H.L. R..C.C. Bridge with Approach Road, Safety work, Diversion work and Misclaneous work in 5th km. of Sirauna - Patahi Road in East Champaran. | Non-Mega | Work Circle-1 | Champaran(Motihari) | East Champaran(Motihari) | FDR | N/A |
57
| Construction of 2x12.50 m H.L. R..C.C. Bridge with Approach Road, Safety work, Diversion work and Misclaneous work in 7th km. of Dhaka - Phulwariya Road in East Champaran. Pile Foundation. M/S. Royal Engineers. | Non-Mega | Work Circle-1 | Champaran(Motihari) | East Champaran(Motihari) | FDR | N/A |
58
| Construction of 5x21.00 m H.L. R..C.C. Bridge work in 11th km. of Motihari-Madhubani ghat Road in East Champaran. Well Foundation. M/S Royal Engineers b | Non-Mega | Work Circle-1 | Champaran(Motihari) | East Champaran(Motihari) | FDR | N/A |
59
| Construction of of H.L. RCC bridge (2X16.00 m) including approach road, diversion and protection work in place of damaged by flood in 2017 in 10th Km of Meerganj chowk -Kuwari by pass to sikti-dhabeli road in the distric of Araria. SHAILESH KR. SINGH | Non-Mega | Work Circle-2 | Katihar | Araria | FDR | N/A |
60
| Construction of H.L.R.C.C. 19x21.00m Bridge including approach road and protection work over Morhar river between Amba-Gaya Road (S.H.-101) in 69th K.M. of Gaya Medical College to Mathurapur Khand in Gaya District Under PLAN SCHEME. (M/s Rakesh Construction Pvt Ltd.,9431303918) | Non-Mega | Work Circle-1 | Gaya | Gaya | Plan | N/A |
61
| Construction of H.L.R.C.C. 16x21.00m Bridge including approach road and protection work over Morhar river between Amba-Gaya Road (S.H.-101) in 70th K.M. of Gaya Medical College to Mathurapur Khand in Gaya District Under PLAN SCHEME. (M/s K.Andi & Associates) | Non-Mega | Work Circle-1 | Gaya | Gaya | Plan | N/A |
62
| Construction of of H.L. RCC bridge (3X18.00 m) including approach road, diversion and protection work in place of damaged by flood in 2017 in Ch. 64 (NH-57A part of road no-6 ) in between Refujy colony to Meerganj chowk in the district of Araria. BIPIN KUMAR SINGH, KATIHAR | Non-Mega | Work Circle-2 | Katihar | Araria | FDR | N/A |
63
| Construction of 7x25M size Bridge in Madanpur-Bhangha Road in Chainage 43.400 Km Pakage No. 03.C.K.Infra structure(Indo-Nepal) | Non-Mega | Work Circle-1 | Champaran(Motihari) | Pachim Champarn | Nabard | |
64
| Construction of H.L.R.C.C. 4x12.50m Bridge including approach road and protection work in 2nd K.M. of Manikpur -Bithra - Senari Road in Arwal District under NABARD Scheme. (R.A.S. Enterprises, 9199245601) | Non-Mega | Work Circle-1 | Gaya | Arwal | Nabard | N/A |
65
| Construction of Bridge at Gerkahiya in Madanpur-Bhangha Road in Chainage 75.734Km Pakage No. 05 (New 78.775KM) | Non-Mega | Work Circle-1 | Champaran(Motihari) | Pachim Champarn | Nabard | N/A |
66
| Construction of H.L. R.C.C. Bridge over Falgu Dharmawati river in 2nd K.M. of Mahuli to Lahuara road in Rohtas District Under MMSNY Sri Brajesh Kr. Singh 9934208735 | Non-Mega | Work Circle-1 | Ara | Rohtas | MMSNY | N/A |
67
| Construction of Bridge at Birha in Madanpur-Bhangha Road in Chainage 72.703Km Pakage No. 05 (New 74.5540KM) | Non-Mega | Work Circle-1 | Champaran(Motihari) | Pachim Champarn | Nabard | N/A |
68
| Construction of of H.L. RCC bridge (3X16.00 m) including approach road, diversion and protection work in place of damaged by flood in 2017 in 8th Km of Meerganj chowk- kuwari by pass to sikti dhabeli road in the district of Araria.ARJU CONST. PATNA | Non-Mega | Work Circle-2 | Katihar | Araria | FDR | N/A |
69
| Construction of HLRCC bridge in Indo -Nepal border road at channage 44.047 km in the district of Purvi champaran Package No-8 (2 x 40M),Barhonia engicor Pvt ltd,9431269809 | Non-Mega | Work Circle-1 | Champaran(Motihari) | East Champaran(Motihari) | Nabard | N/A |
70
| Construction of of H.L. RCC bridge (2X18.00 m) including approach road, diversion and protection work in place of damaged by flood in 2017 in 82Km of Refujee colony-Meerganj chowk (NH57A) road in the district of Araria. ARJU CONST. PATNA | Non-Mega | Work Circle-2 | Katihar | Araria | FDR | N/A |
71
| Construction of HLRCC bridge in Indo -Nepal border road at channage 67.710 km in the district of Purvi champaran Package No- 8 (4 x 35M),Barhonia engicor Pvt ltd,9431269809 | Non-Mega | Work Circle-1 | Champaran(Motihari) | East Champaran(Motihari) | Nabard | N/A |
72
| Construction of HLRCC bridge in Indo -Nepal border road at channage 70.680 km in the district of Purvi champaran Package No- 9 (2 x 40M),Barhonia engicor Pvt ltd,9431269809 | Non-Mega | Work Circle-1 | Champaran(Motihari) | East Champaran(Motihari) | Nabard | N/A |
73
| Construction of HLRCC bridge in Indo -Nepal border road at channage 74.557 km in the district of Purvi champaran Package No- 9 (1 x 30M),Barhonia engicor Pvt ltd,9431269809 | Non-Mega | Work Circle-1 | Champaran(Motihari) | East Champaran(Motihari) | Nabard | N/A |
74
| Construction of HLRCC bridge in Indo -Nepal border road at channage 74.775 km in the district of Purvi champaran Package No- 9 (1 x 15M),Barhonia engicor Pvt ltd,9431269809 | Non-Mega | Work Circle-1 | Champaran(Motihari) | East Champaran(Motihari) | Nabard | N/A |
75
| Construction of HLRCC bridge in Indo -Nepal border road at channage 75.240 km in the district of Purvi champaran Package No- 9 (1 x 30M),Barhonia engicor Pvt ltd,9431269809 | Non-Mega | Work Circle-1 | Champaran(Motihari) | East Champaran(Motihari) | Nabard | N/A |
76
| Construction of H.L. R.C.C. 2x30.00 mtr. In the district of West Champaran under Indo-Nepal Border Ch. 5.819 km. Near Inerwa Bazar. | Non-Mega | Work Circle-1 | Champaran(Motihari) | Pachim Champarn | Nabard | N/A |
77
| Construction of HLRCC bridge in Indo -Nepal border road at channage 77.735 km in the district of Purvi champaran Package No-9 (1 x 30M),Barhonia engicor Pvt ltd,9431269809 | Non-Mega | Work Circle-1 | Champaran(Motihari) | East Champaran(Motihari) | Nabard | N/A |
78
| Construction of of H.L. RCC bridge (3X14.00 m) including approach road, diversion and protection work in place of damaged by flood in 2017 in 15th Km of Parwaha-Mirdaul PWD road in the distrtict of Araria. AAKASH KUMAR, PATNA | Non-Mega | Work Circle-2 | Katihar | Araria | FDR | N/A |
79
| Construction of 1x20.00M Size Bridge at Chainage 18.460Km in Bhangha-Bhutaha Road Pakage No. 06 | Non-Mega | Work Circle-1 | Champaran(Motihari) | Pachim Champarn | Nabard | N/A |
80
| Construction of 3x18.75m H.L R.C.C bridge in river Barjan near Palasmani of Kursakanta block in the District of Araria. ARZU CONST. LTD, PATNA | Non-Mega | Work Circle-2 | Katihar | Araria | Nabard RWD | N/A |
81
| Construction of HLRCC bridge in Indo -Nepal border road at channage 81.150 km in the district of Purvi champaran Package No- 9 (2 x 3M),Barhonia engicor Pvt ltd,9431269809 | Non-Mega | Work Circle-1 | Champaran(Motihari) | East Champaran(Motihari) | Nabard | N/A |
82
| Construction of H.L. R.C.C. Bridge (4x21.75 m) on 7th km. of Balther - Narkatiyaganj Road over Kartaha River. Pile Foundation. M/S SG Piling and Construction Pvt. Ltd. | Non-Mega | Work Circle-1 | Champaran(Motihari) | Pachim Champarn | Nabard RWD | N/A |
83
| Construction of H.L. R.C.C. bridge in 10th Km of Barsoi Banbhui-Dhachana Road of Katihar District. Shankar Sharma | Non-Mega | Work Circle-2 | Katihar | Katihar | Nabard | N/A |
84
| Construction of HLRCC bridge in Indo -Nepal border road at channage 82.180 km in the district of Purvi champaran Package No- 9(2 x 3M),Barhonia engicor Pvt ltd,9431269809 | Non-Mega | Work Circle-1 | Champaran(Motihari) | East Champaran(Motihari) | Nabard | N/A |
85
| Construction Of H.L. R.C.C. Bridge (3x18.75m) over Harpatbeni River on Sukhlahi Path. Pile Foundation. M/S SG. Piling and Construction Pvt. Ltd. | Non-Mega | Work Circle-1 | Champaran(Motihari) | Pachim Champarn | Nabard RWD | N/A |
86
| Construction of HLRCC bridge in Indo -Nepal border road at channage 84.665 km in the district of Purvi champaran Package No- 9 (2 x 30M),Barhonia engicor Pvt ltd,9431269809 | Non-Mega | Work Circle-1 | Champaran(Motihari) | East Champaran(Motihari) | Nabard | N/A |
87
| Construction of 6X21.75m H.L.R.C.C Bridge at Kundi Tola in Mohna Chandpur Panchayat of Barari Block of Katihar District. Vishundev Yadav | Non-Mega | Work Circle-2 | Katihar | Katihar | MMKVY | N/A |
88
| Construction of 5x24.75M R.C.C. brdige over Sikarhana river in Maheshara village (Sikata Block) - Sarisawa bazar (Majhaulia Block) Road. Well foundation Barhonia Engicon Pvt. Ltd. | Non-Mega | Work Circle-1 | Champaran(Motihari) | Pachim Champarn | Nabard | N/A |
89
| Construction of H.L. RCC bridge (5X16.00 M) in Belauri-Shivganj-Salmari Bazar 19th km. of (2nd Cutting) in the district of Katihar. GOKUL HITECH INFRA PVT. LTD. | Non-Mega | Work Circle-2 | Katihar | Katihar | FDR | N/A |
90
| Construction of HLRCC bridge in Indo -Nepal border road at channage 87.670km in the district of Purvi champaran Package No- 9(2 x 3M),Barhonia engicor Pvt ltd,9431269809 | Non-Mega | Work Circle-1 | Champaran(Motihari) | East Champaran(Motihari) | Nabard | N/A |
91
| Construction of H.L. RCC bridge (3X16.00 M) in Belauri-Shivganj-Salmari Bazar 19th km. of (1st Cutting) in the district of Katihar. BABAN KUMAR SINGH | Non-Mega | Work Circle-2 | Katihar | Katihar | FDR | N/A |
92
| Construction of HLRCC bridge in Indo -Nepal border road at channage 89.210 km in the district of Purvi champaran Package No- 10 (2 x 3M),Barhonia engicor Pvt ltd,9431269809 | Non-Mega | Work Circle-1 | Champaran(Motihari) | East Champaran(Motihari) | Nabard | N/A |
93
| Construction of 5x24.75M R.C.C. brdige over Trimuhan river in Dhankutawa village (Sikata Block)-Shivpur (Lauria or Chanpatia Block) Road. Well foundation. Chankya construction Pvt. Ltd. | Non-Mega | Work Circle-1 | Champaran(Motihari) | Pachim Champarn | Nabard | N/A |
94
| Construction of HLRCC bridge in Indo -Nepal border road at channage 93.150 km in the district of Purvi champaran Package No-10(2 x 5M),Barhonia engicor Pvt ltd,9431269809 | Non-Mega | Work Circle-1 | Champaran(Motihari) | East Champaran(Motihari) | Nabard | N/A |
95
| Construction of RCC HL bridge (2X16.50 m) including approach road, diversion and protection work in place of damaged by flood in 2017 in the 3rd km of Aajamnagar link road in the district of Katihar. M/S JAI SHIV CONSTRUCTION | Non-Mega | Work Circle-2 | Katihar | Katihar | FDR | N/A |
96
| Construction of HLRCC bridge in Indo -Nepal border road at channage 107.935 km in the district of Purvi champaran Package No-10 (1 x 20M),Barhonia engicor Pvt ltd,9431269809 | Non-Mega | Work Circle-1 | Champaran(Motihari) | East Champaran(Motihari) | Nabard | N/A |
97
| Construction Of H.L. R.C.C. Bridge (4x21.75m) over Pandai River on Narkatiyaganj - Balthar Road in West Champaran . Pile Foundation M/S Rohan Construction Pvt. Ltd. | Non-Mega | Work Circle-1 | Champaran(Motihari) | Pachim Champarn | Nabard RWD | N/A |
98
| Construction of RCC HL bridge (2x16.00 m) including approach road, diversion and protection work in place of damaged by flood in 2017 in the 42th km of Katihar-Sonali-Jhowa-Salmari-Barsoi-Balrampur road in the district of Katihar. M/S SHAILESH KUMAR | Non-Mega | Work Circle-2 | Katihar | Katihar | FDR | N/A |
99
| Construction of HLRCC bridge in Indo -Nepal border road at channage 108.078 km in the district of Purvi champaran Package No-10 (1 x 20M),Barhonia engicor Pvt ltd,9431269809 | Non-Mega | Work Circle-1 | Champaran(Motihari) | East Champaran(Motihari) | Nabard | N/A |
100
| Construction of H.L. R.C.C. Bridge (7x12.00m) on 1st Km. of Lauriya - Ramnagar Road. Pile Foundation M/S Haque Construction. | Non-Mega | Work Circle-1 | Champaran(Motihari) | Pachim Champarn | FDR | N/A |
101
| Costruction of HLRCC bridge with 1.22 km Long Approach Road, Protection Work and Guide Bundh in Madhepur - Thengha Ghat at Western Dhar across Kamla river 8x24.75m in the district of Darbhanga (RIDF-XVI) RCD | Non-Mega | Work Circle-2 | Darbhanga | Darbhanga | Nabard | N/A |
102
| Construction of RCC HL bridge (2x18.00 m) including approach road, diversion and protection work in place of damaged by flood in 2017 in the 35th km of Katihar-Sonali-Jhowa-Salmari-Barsoi-Balrampur road in the district of Katihar. BIPIN KUMAR SINGH | Non-Mega | Work Circle-2 | Katihar | Katihar | FDR | N/A |
103
| Construction of 3 Pontoon bridge over Gandak River (Dhara No.-1 (10x12.20M) between Pujaha Ghat towards Bettiah and Srinagar, Dhara No.- 2 (10x12.00M) between Srinagar Panchayat and Dhumnagar, Dhara No.-3 (13x12.00M). Between Dhumnagar and jagirha Ghat) between Srinagar Bhatahwa - Jagirha Ghat in West Champaran. (Resetting and Maintenance F.Y. - 2017-18 to 2020-21) | Non-Mega | Work Circle-1 | Champaran(Motihari) | Pachim Champarn | Plan | N/A |
104
| Costruction of HLRCC bridge with Approach Road, Protection Work at Kusheshwar Dhabaulia Road across river Kamla 6x21.75m in the district of Darbhanga (RIDF-XVI) RCD | Non-Mega | Work Circle-2 | Darbhanga | Darbhanga | Nabard | N/A |
105
| Costruction of HLRCC bridge with Approach Road, Protection Work at Kamtaul Jogiyara Road across river Khiroi in the district of Darbhanga (RIDF-XVI) RCD | Non-Mega | Work Circle-2 | Darbhanga | Darbhanga | Nabard | N/A |
106
| Construction of RCC HL bridge (2x21.75m) at 9th KM of Kadwa Block headquarter-chowki via bharri Aashiyani road including approach road diversion, protection work and road sefty in place of dmaged road by flood in 2017 in the district of Katihar. M/S SHIV SHAKTI CONST. PURNEA | Non-Mega | Work Circle-2 | Katihar | Katihar | FDR | N/A |
107
| Costruction of HLRCC bridge with Approach Road, Protection Work at Goriyari Panchayat of Hanuman Nagar Block across river Nima 5x18.75m in the district of Darbhanga (RIDF-XVII) RWD | Non-Mega | Work Circle-2 | Darbhanga | Darbhanga | Nabard | N/A |
108
| Construction of H.L. R.C.C. Bridge (8x16.00m) over Balore River on 1st km. of Narkatiyaganj - Binwalia Road. Pile Foundation. M/S Aditya Construction Pvt. Ltd. | Non-Mega | Work Circle-1 | Champaran(Motihari) | Pachim Champarn | Plan | N/A |
109
| Costruction of HLRCC bridge with Approach Road, Protection Work under Taradih Block at Madariya Ghat across river Kamla in the district of Darbhanga. RWD | Non-Mega | Work Circle-2 | Darbhanga | Darbhanga | Nabard | N/A |
110
| Costruction of HLRCC bridge in 6th Km of Ghanshyampur Rasiyari Road at Shivnagar Ghat under Non-Plan Head RCD | Non-Mega | Work Circle-2 | Darbhanga | Darbhanga | Nabard | N/A |
111
| Costruction of HLRCC bridge in 2nd Km of Thengaha Mahinam Road in the District of Darbhanga under Non-Plan Head RCD | Non-Mega | Work Circle-2 | Darbhanga | Darbhanga | Nabard | N/A |
112
| Construction of RCC HL bridge (6x21.00m) in the 15th Km of Katihar-Sonaili-Jhowa-salmari-Barsoi-Balrampur road including approach road diversion, protection work in place of damaged road by flood in 2017 in the distric of Katihar. MUKESH KUMAR, KATIHAR | Non-Mega | Work Circle-2 | Katihar | Katihar | FDR | N/A |
113
| Costruction of HLRCC bridge with Approach Road, Protection Work in 2nd Km of Somnaha - Birauli Road 9x21.75m in the district of Samastipur (RIDF-XVI) RWD | Non-Mega | Work Circle-2 | Darbhanga | Samastipur | Nabard | N/A |
114
| Construction of H.L. R.C.C. Bridge (5x12.00m) on 1st Km. of Lauriya - Sikarpur-Thori Road. Pile Foundation M/S Parmar Construction . | Non-Mega | Work Circle-1 | Champaran(Motihari) | Pachim Champarn | FDR | |
115
| Costruction of HLRCC bridge with Approach Road, Protection Work at Bisaua Ghat in the district of Begusarai under MMSNY Head RWD | Non-Mega | Work Circle-2 | Darbhanga | Begusarai | Nabard | N/A |
116
| Costruction of HLRCC bridge near Chandika Asthan in Pokharia Village of Sahebpur Kamal Block in the district of Begusarai under MMSNY Head RWD | Non-Mega | Work Circle-2 | Darbhanga | Begusarai | Nabard | N/A |
117
| Construction of RCC HL bridge (6x21.00m) at 28th KM of Belauri-Shivganj-Sonaili-Salmari Bazar road in this district of Katihar. ARJUN PRASAD, | Non-Mega | Work Circle-2 | Katihar | Katihar | FDR | N/A |
118
| costruction of HLRCC bridge in the river Balan at basahi ghat under bhagwanpur block(6x21.75 m)Mansa Engicom Pvt. Ltd.,9431060060 RWD | Non-Mega | Work Circle-2 | Khagaria | Begusarai | MMSNY | N/A |
119
| Costruction of HLRCC bridge in Sakrauli Rampur Karak Road at Rampur Ghat across river Burdhi Gandak in the district of Begusarai Samastipur under MMSNY Head RWD | Non-Mega | Work Circle-2 | Darbhanga | Samastipur | MMSNY | N/A |
120
| Costruction of HLRCC bridge with Approach Road, Protection Work and Guide Bundh in Madhepur - Thengha Ghat at Eastern Dhar across Kamla river 13x24.75m in the district of Madhubani (RIDF-XVI) RCD | Non-Mega | Work Circle-2 | Darbhanga | Darbhanga | Nabard | N/A |
121
| Construction of H.L. RCC Bridge in 14th K.M. of Bhabhua Aghaura road in the District of Kaimur (Bhabhua) Length of Approach road- (115M + 160M) Basant Vanijya Ltd., Gaya, | Non-Mega | Work Circle-1 | Ara | Kaimur(Bhabua) | Plan | N/A |
122
| Construction of H.L. RCC Bridge over River Durgawati near Baghel High School in Miriya Panchayat in the District of Kaimur including approach road. | Non-Mega | Work Circle-1 | Ara | Kaimur(Bhabua) | Nabard | N/A |
123
| Construction of 4x21m Size of H.L. R.C.C. bridge at Chainage 63.698of Refugee colony to Meerganj Chock of Indo Nepal Border Road in the District of Araria. M.K. Gupta & Co. | Non-Mega | Work Circle-2 | Katihar | Araria | Nabard | N/A |
124
| Construction of 5x24m Size of H.L. R.C.C. bridge at Chainage 83.844 of Refugee colony to Meerganj Chock of Indo Nepal Border Road in the District of Araria. Bhartiya Infra Projects Ltd. | Non-Mega | Work Circle-2 | Katihar | Araria | Nabard | N/A |
125
| Construction of 4x30m Size of H.L. R.C.C. bridge at Chainage 89.350 of Refugee colony to Meerganj Chock of Indo Nepal Border Road in the District of Araria. Bhartiya Infra Projects Ltd. | Non-Mega | Work Circle-2 | Katihar | Araria | Nabard | N/A |
126
| Construction of 1x30m Size of H.L. R.C.C. bridge at (Baidhnathpur) Mieerganj Railway crossing to Dhabeli Road Chainage 5.4 of Indo-Nepal Border Road in the District of Araria. Maa Kali Civicon Corporation Pvt. Ltd. | Non-Mega | Work Circle-2 | Katihar | Araria | Nabard | N/A |
127
| Construction of 3x16.50m H.L. R.C.C. Bridge including approach Road in 13th Km. of Chowki-Bhari-Asiyani Road of Kadwa Block in the District of Katihar. | Non-Mega | Work Circle-2 | Katihar | Katihar | Non-Plan | N/A |
128
| Construction & Resetting of new Pontoon Bridge and Maintenace of Pontoon Bridge form Year 2016-17 to 2020-21 and Dismentling of Pontoon Bridge form the Alignment and storing the Pontoon sets at safe place on the side of river embankment at Pahleza Ghat inbetween Gaddipatti to Ramsapur during rainy season. Agency- Shrishti Developers Pvt. Ltd. Mob.-9431014606 | Non-Mega | Work Circle-1 | Saran Works | Saran | Plan | N/A |
129
| Construction of R.C.C. Bridge in 3rd Km of Barari Mardhiya Road of Katihar District. | Non-Mega | Work Circle-2 | Katihar | Katihar | Non-Plan | N/A |
130
| Construction of R.C.C. Bridge in 17th Km (5th Cutting) of Manihari-Amdabad in the District of Katihar District | Non-Mega | Work Circle-2 | Katihar | Katihar | BVVK | N/A |
131
| Construction of H.L.RCC Bridge at 19th K.M. of Mohania-Ramgarh road (2x18+4x26)m across Durgawati River in Kaimur District. Jai Mata Dee Maa Sita Construction. Mob-9934462616 | Non-Mega | Work Circle-1 | Ara | Kaimur(Bhabua) | Plan | |
132
| Construction of R.C.C. Bridge in 18th Km (6th Cutting) of Manihari-Amdabad in the District of Katihar District | Non-Mega | Work Circle-2 | Katihar | Katihar | BVVK | N/A |
133
| Construction of H.L. R.C.C. Bridger Over Kauw river in samta Bigha - Dhasadih at Sambhal bigha-Semaradih in Sasaram Block in the District of Rohtas under MMSNY. (Brajesh Kumar Singh) | Non-Mega | Work Circle-1 | Ara | Rohtas | MMSNY | N/A |
134
| Construction of 2x10.50m H.L. R.C.C. Bridge in 3rd KM of Araria-Chanderdei-Rajokhar Road of Araria District. | Non-Mega | Work Circle-2 | Katihar | Araria | Non-Plan | N/A |
135
| Construction of H.L. RCC Bridge over river Kurba near Akhtiayarpur village in the District of Bhojpur including approach road Length of Approach road- (100 M + 100M) Jai Mata Di Road Construction Pvt. Ltd., 9431012004 | Non-Mega | Work Circle-1 | Ara | Ara | MMSNY | N/A |
136
| Construction of H.L.R.C.C. 17x21.75m Bridge including approach road and protection work over river Muhane between Silaunjua-Bataspur village in BodhGaya Block of Gaya District under NABARD Scheme. (Ajay Engicon Pvt. Ltd., Aurangabad (Bihar). | Non-Mega | Work Circle-1 | Gaya | Gaya | Nabard RWD | N/A |
137
| Construction of H.L.R.C.C. 22x21.75m Bridge including approach road and protection work over Falgu river in Sripur-Keni Road in Gaya District under NABARD Scheme. (M/s Rakesh Construction Pvt Ltd.,9431303918) | Non-Mega | Work Circle-1 | Gaya | Gaya | Nabard RWD | N/A |
138
| Construction of H.L. R.C.C. Bridge over Libari Dhar in Chathila peer to Jayprakash Nagar Mahadalit Tola Road of K. Nagar Block in the District of Purnea. | Non-Mega | Work Circle-2 | Katihar | Purnia | Nabard | N/A |
139
| Construction of H.L. R.C.C. Bridge over Sahra Phul Tola in K. Nagar Block in the District of Purnea. | Non-Mega | Work Circle-2 | Katihar | Purnia | Nabard | N/A |
140
| Construction of H.L. R.C.C. Bridge over Chikni Sarnarthi Tola in the District of Purnea. | Non-Mega | Work Circle-2 | Katihar | Purnia | Nabard | N/A |
141
| Construction of H.L.R.C.C. 4x16.00m Bridge including approach road and protection work in 2ND K.M. of Domuhan-Cherki Road (K.M. 0 to K.M. 0.93) in Gaya District under PLAN Scheme. (R.A.S. Enterprises, 9199245601) | Non-Mega | Work Circle-1 | Gaya | Gaya | Plan | N/A |
142
| Construction of H.L.R.C.C. 3x14.00m Bridge including approach road and protection work in Dhangai Bazar to B.B. Pesra-Sobh to G.T. Road (K.M. 0 to K.M. 14.10) in Chainage 3560 M in Gaya District under PLAN Scheme. (M/s. Laxman Kumar) | Non-Mega | Work Circle-1 | Gaya | Gaya | Plan | N/A |
143
| Construction of 4x7.20x3.755M Size Bridge at Chainage 5.714Km in Bhangha-Bhutaha Road Pakage No. 05 | Non-Mega | Work Circle-1 | Champaran(Motihari) | Pachim Champarn | Nabard | N/A |
144
| Construction of H.L.R.C.C. 3x14.00m Bridge including approach road and protection work in Dhangai Bazar to B.B. Pesra-Sobh to G.T. Road (K.M. 0 to K.M. 14.10) in Chainage 4545 M in Gaya District under PLAN Scheme. (Shree Tirupati Balaji Enterprises, 9470664329) | Non-Mega | Work Circle-1 | Gaya | Gaya | Plan | N/A |
145
| Construction of RCC Bridge over Sikarhana River in 6th Km of bagaha-Semara Road in West Champaran District. | Non-Mega | Work Circle-1 | Champaran(Motihari) | Pachim Champarn | Plan | N/A |
146
| Construction of H.L.R.C.C. 3x14.00m Bridge including approach road and protection work in Dhangai Bazar to B.B. Pesra-Sobh to G.T. Road (K.M. 0 to K.M. 14.10) in Chainage 13970 M in Gaya District under PLAN Scheme. (M/s. JAY SHANKAR RAY, Muzaffarpur) | Non-Mega | Work Circle-1 | Gaya | Gaya | Plan | N/A |
147
| Construction of R.C.C. H.L. Bridge including Guide Bhand, Restoration work, Remaining work and Approach Road over Bahati River to Connect old RCC Bridge with west embankment of Koshi in Telwa Village in Saharsa District. | Non-Mega | Work Circle-2 | Saharsa | Saharsa | Nabard | N/A |
148
| Construction of RCC HL bridge (2x21.75 m) including approach road, diversion and protection work in place of damaged by flood in 2017 in the 4th Km of Damdama-Azamnagar-Keshari Chwok via Azamnagar railway Station road in the district of Katihar. OM CONT. KATIHAR | Non-Mega | Work Circle-2 | Katihar | Katihar | FDR | N/A |
149
| Construction of H.L.R.C.C. 3x21.00m Bridge including approach road and protection work in Bhalua to Paharpur Road (K.M. 0 to K.M. 26.325) in Chainage 600 M in Gaya District under PLAN Scheme. (Ramiya Construction Pvt. Ltd., Gaya,09431226444) | Non-Mega | Work Circle-1 | Gaya | Gaya | Plan | N/A |
150
| "Construction of 3x18.75m span H.L. R.C.C. Bridge over Nasi Tola Dhar of Damaily Panchayat under Dhamdha Block in the District of Purnea. Baba Construction." | Non-Mega | Work Circle-2 | Katihar | Purnia | Nabard | N/A |
151
| Construction of H.L.R.C.C. 20x21.75m Bridge including approach road and protection work over Morhar River at Chitabkhurd village in Amas Block in Gaya District under PLAN Scheme.(R.A.S. Enterprises, 9199245601) | Non-Mega | Work Circle-1 | Gaya | Gaya | Plan | N/A |
152
| "Construction of Balance work of H.L. RCC bridge (4x21.00 m) in 9th km of Jokihat-Dalmalpur-Gerua road in the district of Purnia BAIJNATH SHARMA" | Non-Mega | Work Circle-2 | Katihar | Purnia | FDR | N/A |
153
| Construction of H.L.R.C.C. 9x21.00m Bridge including approach road and protection work over Morhar River Between Chitabkala and Gendabag village in Sherghati Block in Gaya District.(RAMIYA CONSTRUCTION LTD.,GAYA,09431226444) | Non-Mega | Work Circle-1 | Gaya | Gaya | Plan | N/A |
154
| Construction of of H.L. RCC bridge (3X16.50 m) in 9th km. of Kali Mandir to Baraily road in the District of Purnea.SHANKAR SHARMA | Non-Mega | Work Circle-2 | Katihar | Purnia | FDR | N/A |
155
| Construction of H.L.R.C.C. Box Cell 4x16.00m Bridge including approach road and protection work in Dumariya to Belaghati (Jharkhand Border) via Kacher at 7th K.M. in Gaya District under PLAN Scheme. (Haque Construction Co., 9431223551) | Non-Mega | Work Circle-1 | Gaya | Gaya | Plan | N/A |
156
| "Construction of of H.L. RCC bridge (3X16.00 m) in (SH-99) 9th km. of Baisi-Amour-Bahadurganj road in the District of Purnea. RAJKISHOR SINGH" | Non-Mega | Work Circle-2 | Katihar | Purnia | FDR | N/A |
157
| "Construction of H.L. RCC bridge (3x16.50 M) in 2nd Km. of Ekhua mahmadodia-Bareli-Duboli road in the district of Purnea. BAIJNATH SHARMA" | Non-Mega | Work Circle-2 | Katihar | Purnia | FDR | N/A |
158
| "Construction of RCC HL bridge (8x18.00m) including approach road, diversion and protection work in the place of 10th km of Jokihat-Dalmalpur-Gerua road in the district of Purnia. SHANKAR SHARMA & BAIJNATH SHARMA (J.V.)" | Non-Mega | Work Circle-2 | Katihar | Purnia | FDR | N/A |
159
| "Construction of H.L. RCC bridge (3X16.50 M) in the 7th km of Ekba-Mahammodia-Dubouli road in the district of Purnia. M/S SHAILESH KUMAR" | Non-Mega | Work Circle-2 | Katihar | Purnia | FDR | N/A |
160
| "Construction of H.L. RCC bridge (3X16.50 M) in the 9th km of Belgachhi PWD road via Nitendra-Machharhatta-Geria road in the district of Purnia. HAQUE CONSTRUCTION" | Non-Mega | Work Circle-2 | Katihar | Purnia | FDR | N/A |
161
| "Construction of RCC HL bridge (4x16.00 m) including approach road, diversion and protection work in place of damaged by flood in 2017 in the 6th km of Jokihat-Dalmalpur-Garua road in the district of Purnea. RAJ KISHOR SINGH" | Non-Mega | Work Circle-2 | Katihar | Purnia | FDR | N/A |
162
| "Construction of RCC HL bridge (2X24.00 m) including approach road, diversion and protection work in place of damaged by flood in 2017 in the 29th km of Biasi-Amor-Bahadurganj road(SH-99) in the district of Purnea. HAQUE CONSTRUCTION" | Non-Mega | Work Circle-2 | Katihar | Purnia | FDR | N/A |
163
| Construction of HL RCC bridge 4x10.00m in place of old bridge over Panchane river at 126 th km Biharshariff-Bakhtiyarpur road in Nalanda district. | Non-Mega | Work Circle-2 | Nalanda | Nalanda | CRF | N/A |
164
| "Construction of RCC HL bridge including approach road, diversion and protection work in place of damaged by flood in 2017 in 1st Km of Palsa- Kali Mandir-Baraili Road (4x21.00m)span (Ch. 245m to 340m) and (5x21.00m) span in (Ch. 480m to 600m ) in the district of Purnea. HAQUE CONSTRUCTION Muzaffarpur" | Non-Mega | Work Circle-2 | Katihar | Purnia | FDR | N/A |
165
| "Construction of RCC HL bridge (3X24.75 m) including approach road, diversion and protection work in place of damaged by flood in 2017 in the 1st Km of Belgachi PWD Road Via Nitendra-Macharhatta-goria road in the district of Purnea. M/S SHIV SHAKTI CONST. PURNEA" | Non-Mega | Work Circle-2 | Katihar | Purnia | FDR | N/A |
166
| construction of HL RCC bridge 9x24.75M on Harohar river in Sadaibigha village at Barahiya block in Lakhisarai district. NARAYAN DAS CONSTRUCTION Mob. - 9431815725 / 9431815726 | Non-Mega | Work Circle-2 | Nalanda | Lakhisarai | Plan | N/A |
167
| "Construction of RCC HL bridge (5X24.00 m) including approach road, diversion and protection work in place of damaged by flood in 2017 in the 4th Km of Plasi-Baraili road in the district of Purnea. PRABHAT KR. " | Non-Mega | Work Circle-2 | Katihar | Purnia | FDR | N/A |
168
| Construction of H.L.R.C.C. Bridge in Kodariya under Meenapur Block in the district of Muzaffarpur (Nabard) | Non-Mega | Work Circle-1 | Muzaffarpur | Muzaffarpur | Nabard | N/A |
169
| Construction of Baisaghat Bridge with two Minor Bridge including approach road and protection work in 9th Mile of Amour-Bahadurganj Road of Purnea District 2. Construction of Guird Bandh for Protection of Baisaghat Bridge on river Kanki in 9th Mile of Amour-Bahadurganj Road of Purnea District 3. Construction of 11x21.75m H.L. R.C.C. Bridge with two Minor Bridge and 3.50Km approach road over river Kanki in 9th Mile of Amour-Bahadurganj Road of Purnea District. | Non-Mega | Work Circle-2 | Saharsa | Purnia | CRF | N/A |
170
| Construction of H.L.R.C.C Bridge 3x14.50 m over Mohane river Near Sitabigha village of Parwalpur Block under Naward Scheme of Nalanda district. SHANTI CONSTRUCTION Mob. - 9931288855/9431020868 | Non-Mega | Work Circle-2 | Nalanda | Nalanda | Nabard RWD | |
171
| Construction of H.L.R.C.C Bridge 6x14.50 m over lokine river Near Radhil Chhilka of Ekangarsarai Block under Nalanda district. SANJAY KUMAR Mob. - 9386240810 | Non-Mega | Work Circle-2 | Nalanda | Nalanda | Nabard RWD | |
172
| Construction of H.L. Bridge 5 x14.50 m Berma-Arai Road of Karai-Parsurai block under nalanda district. district of Nalanda. DREAM EARTHCON PRIVATE LIMITED Mob. -9431115628 | Non-Mega | Work Circle-2 | Nalanda | Nalanda | Nabard RWD | |
173
| Construction of H.L, R.C.C Bridge(4X16.5)with its approach road in 6th K.M. of Balua - Baysi Road in Palce of Murli Branch Cannal in the district of Supaul. (Haque Construction Co., Sarai Syed Ali, Muzaffarpur-842001)(PKG-28) | Non-Mega | Work Circle-2 | External Project Division | Supaul | WBP Phase-2 | N/A |
174
| Costruction of HLRCC bridge and approach road, protection work at Tani Pakari under Veerpur Block in the district of Begusarai under MMSNY Head RWD | Non-Mega | Work Circle-2 | Darbhanga | Begusarai | MMSNY | N/A |
175
| Costruction of HLRCC bridge at Parihara Ghat in the district of Begusarai under MMSNY Head RWD | Non-Mega | Work Circle-2 | Darbhanga | Darbhanga | MMSNY | N/A |
176
| (a) Construction of H.L.R.C.C. Bridge, 3x16.50M and approach road work in 4th Km. of Khusrupur-Nagarnausa Road at Nirmali chak Middle School of Khusrupur Block, in the District of Patna.(RECON,PATNA) | Non-Mega | Work Circle-1 | Patna-1 | Patna | Nabard | N/A |
177
| Construction of H.L. R.C.C. Bridge(1X37.5) with its approach road in 1st K.m. of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul. (Royal Infraconstru Ltd., Godrej Waterside Building, Tower No.-1, 4th Floor, No.-401 Plot No.-5, DP Block, Salt Lake, Sector-V, Kolkata-700091)(PLK.01 A) | Non-Mega | Work Circle-2 | External Project Division | Supaul | WBP Phase-2 | N/A |
178
| (b) Construction of Balance work of one span out of three span H.L.R.C.C. Bridge (1x16.50M) across Dhaba River in 4th Km. of Khusrupur-Nagarnausa Road at Nirmali chak Middle Vidayalay in Patna Dist. Including Approach in both side and Bituminous work thereof.(NARAYAN INFO VENTURE PVT.LTD.,PATNA) | Non-Mega | Work Circle-1 | Patna-1 | Patna | Nabard | |
179
| Construction of H.L. R.C.C. Bridge(1X37.5) with its approach road in 6th K.m. of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul. (Royal Infraconstru Ltd., Godrej Waterside Building, Tower No.-1, 4th Floor, No.-401 Plot No.-5, DP Block, Salt Lake, Sector-V, Kolkata-700091)(PKG-01 B) | Non-Mega | Work Circle-2 | External Project Division | Supaul | WBP Phase-2 | N/A |
180
| Construction of Pontoon Bridge in river Ganga between Danapur to Panapur Diyara (including opening & Resetting for 5 Years) in district Patna.(SHIBU CONSTRUCTION PVT.LTD,DANAPUR,PATNA) | Non-Mega | Work Circle-1 | Patna-1 | Patna | Non-Plan | |
181
| Construction of H.L, R.C.C Bridge(3x33) with its approach road in 2nd K.M. of Karpoori Chowk - Patarghat Road in Palce of Old S.P. Bridge in the district of Madhepura. {Raj Construction, Meenapur, Salmari, Katihar-855113 (Bihar)}--Pkg.02 | Non-Mega | Work Circle-2 | External Project Division | Madhepura | WBP Phase-2 | N/A |
182
| Construction of H.L, R.C.C Bridge(2X33) with its approach road in 3rd K.M. of Panchgachhiya - Nauhatta Road in Palce of Old S.P. Bridge in the district of Saharsa. (Lall Construction Co., AA-105, Shalimar Bagh, Delhi-110088)( Package- 3 A) | Non-Mega | Work Circle-2 | External Project Division | Saharsa | WBP Phase-2 | N/A |
183
| Construction of Pontoon Bridge in river Ganga between Gyaspur to Kaladiyara Diyara (including opening & Resetting for 5 Years) of Bakhtiyarpur Block in district Patna.(RUBI INDUSTRIAL FASTNERS,PATLIPUTRA COLONY,PATNA) | Non-Mega | Work Circle-1 | Patna-1 | Patna | Non-Plan | N/A |
184
| Construction of H.L, R.C.C Bridge(2X25) with its approach road in 7th K.m of Panchgachhiya-Nauhatta road in Palce of damaged Old R.C.C Bridge in the district of Saharsa. (Lall Construction Co., AA-105, Shalimar Bagh, Delhi-110088)(Package- 3 B) | Non-Mega | Work Circle-2 | External Project Division | Saharsa | WBP Phase-2 | N/A |
185
| Construction of H.L, R.C.C Bridge(2X25) with its approach road in 7th K.m of Saraigarh-Lalganj-Ganpatganj road in the district of Supaul. (Lall Construction Co., AA-105, Shalimar Bagh, Delhi-110088)(PKG-6A) | Non-Mega | Work Circle-2 | External Project Division | Supaul | WBP Phase-2 | N/A |
186
| Construction of H.L.R.C.C. Bridge 5x24.0 m in Punpun River in 11th Km of Masaurhi-Naubatpur Pitmas Road in Patna District.(S.B.ENGICONPVT.LTD.DANAPUR,PATNA) | Non-Mega | Work Circle-1 | Patna-1 | Patna | Plan | N/A |
187
| Construction of H.L, R.C.C Bridge(2X33) with its approach road in 7th K.m of Meha - Simar Ganpatganj Road in Palce of damaged Old S.P. Bridge in the district of Supaul.(Lall Construction Co., AA-105, Shalimar Bagh, Delhi-110088)(PKG-06B ) | Non-Mega | Work Circle-2 | External Project Division | Supaul | WBP Phase-2 | N/A |
188
| Construction of H.L, R.C.C Bridge(4x25) with its approach road in 10th K.m in Khurhan-Parel-Ratwara-Kapasia road in the district of Madhepura (Extended part of RCD road 0 to 15 k.m.) (Haque Construction Co., Sarai Syed Ali, Muzaffarpur-842001 (PKG.7A) | Non-Mega | Work Circle-2 | External Project Division | Madhepura | WBP Phase-2 | |
189
| "Construction of 12x24.00 m H.L.R.C.C. Bridge in Athar Ghat over Bhudhi Gandak river under Bochaha Block in the district of Muzaffapur. (Plan) Ganesh Ram Dokania, Mob- 9471637819" | Non-Mega | Work Circle-1 | Muzaffarpur | Muzaffarpur | Plan | N/A |
190
| Construction of Pontoon Bridge in river Ganga between Kachidargah to Rustampur (Raghopur) (including setting, Resetting for 5 Years) of Raghopur Block in district Vaishali.(RAJNISH KUMAR,SHAHPUR,DANAPUR,PATNA) | Non-Mega | Work Circle-1 | Patna-1 | Patna | Non-Plan | |
191
| Construction of H.L, R.C.C Bridge(2X21) with its approach road in 5th K.m of Alamnagar-Budhma- Mali road in the district of Madhepura. (Haque Construction Co., Sarai Syed Ali, Muzaffarpur-842001)(PKG-7B) | Non-Mega | Work Circle-2 | External Project Division | Madhepura | WBP Phase-2 | |
192
| "Construction of 4x24.00m H.L.R.C.C. Bridge in 1st km of Meenapur Belsand Road in the district of Muzaffarpur. Jay Shankar Kumar, Mob-9431006580 " | Non-Mega | Work Circle-1 | Muzaffarpur | Muzaffarpur | Plan | N/A |
193
| Construction of H.L, R.C.C Bridge (3X33)with its approach road in 5th K.m of Baluwahat koshi bandh via Aghori-Sakra-Paharpur-Baghwa road in Place of SP Bridge in the district of Saharsa.{Shiv Kishore Construction Pvt. Ltd., At-Saidnagar, Opposite Petrol Pump, Laheriasarai, Darbhanga-846001 (Bihar)}(PKG-08) | Non-Mega | Work Circle-2 | External Project Division | Saharsa | WBP Phase-2 | N/A |
194
| "Construction of 3x18.75m H.L.R.C.C. Bridge in 7th km of Aurai- Jale Road in the district of Muzaffarpur. Ram Swarth Rai, Mob- 9471091378" | Non-Mega | Work Circle-1 | Muzaffarpur | Muzaffarpur | FDR | N/A |
195
| Construction of 2x30m Size of H.L. R.C.C. bridge at (Velbwa River) Mieerganj Railway crossing to Dhabeli Road Chainage 30.75 of Indo-Nepal Border Road in the District of Araria. Baba Const. | Non-Mega | Work Circle-2 | Katihar | Araria | Nabard | N/A |
196
| "Construction of 3x18.75m H.L.R.C.C. Bridge in 3rd km of Aurai- Jale Road in the district of Muzaffarpur. Ram Swarth Rai, Mob- 9471091378" | Non-Mega | Work Circle-1 | Muzaffarpur | Muzaffarpur | FDR | N/A |
197
| Construction of H.L, R.C.C Bridge(5X21) with its approach road in 11th K.m of Chandradei-Bangama-Matiyari-Mogra road in the district of Araria.(PKG-10) {Nirman Engicons Pvt. Ltd., At + P.O.- Mohanpur, District-Begusarai (Bihar)-851131}(PKG-10) | Non-Mega | Work Circle-2 | External Project Division | Araria | WBP Phase-2 | |
198
| Construction of H.L, R.C.C Bridge(2X25) with its approach road in Tharbitya-Bisanpur (near Parsa) road in the district of Supaul. (Lall Construction Co., AA-105, Shalimar Bagh, Delhi-110088) (PKG-11A) | Non-Mega | Work Circle-2 | External Project Division | Supaul | WBP Phase-2 | N/A |
199
| Construction of R.C.C H.L Bridge Belsand-chhitauni-Tariyani Road in 2nd Km. 4x21.00M District of Sitamarhi. | Non-Mega | Work Circle-1 | Muzaffarpur | Sitamarhi | Nabard | N/A |
200
| Construction of 27x30m Size of H.L. R.C.C. bridge at (Saidabad) Mieerganj Railway crossing to Dhabeli Road Chainage 50.80 of Indo-Nepal Border Road in the District of Araria. D2S Infra Structures Pvt. Ltd. | Non-Mega | Work Circle-2 | Katihar | Araria | Nabard | N/A |
201
| Construction of H.L, R.C.C Bridge(2X25) with its approach road in Tharbitya-Bisanpur (near Sindhiyan) road in the district of Supaul.(Lall Construction Co., AA-105, Shalimar Bagh, Delhi-110088)(PKG-11 B) | Non-Mega | Work Circle-2 | External Project Division | Supaul | WBP Phase-2 | N/A |
202
| Construction of R.C.C H.L Bridge Across Lakhandei River in Bahar-Village to Kanauli Road under Indo-Nepal Border Road (Chainage-132.400) 1x40.00m District of Sitamarhi. | Non-Mega | Work Circle-1 | Muzaffarpur | Sitamarhi | Nabard | N/A |
203
| Construction of H.L, R.C.C Bridge(6X33) with its approach road in 13th Km (1st Cutting) in Khapur Culvert of Khurhan-Parel-Ratwara-Kapasia road in the district of Madhepura. (Extended part of RCD road 0 to 15 k.m.) (Lall Construction Co., AA-105, Shalimar Bagh, Delhi-110088)(PKG-12) | Non-Mega | Work Circle-2 | External Project Division | Madhepura | WBP Phase-2 | N/A |
204
| Construction of R.C.C H.L Bridge Across Lakhandei River in Bhittah Mor Chikani to Parsa Road under Indo-Nepal Border Road (Chainage-3.906) 1x25.00m District of Sitamarhi. | Non-Mega | Work Circle-1 | Muzaffarpur | Sitamarhi | Nabard | N/A |
205
| Construction of 7x21.75M Bridge over Paharia Ghat of Bakra River in Kursakanta to Teera Road of Dom Sadak Road in the District of Araria. M/S Raj Construction | Non-Mega | Work Circle-2 | Katihar | Araria | Nabard RWD | N/A |
206
| Construction of H.L, R.C.C Bridge(4X21) with its approach road in 16th K.M. of Kadava-Sonouli Road in Purnia District.(Tirupati Balaji Earth Work Pvt. Ltd., A/230, P.C. Colony, Kankarbagh, Patna-800020)( PKG-14A ) | Non-Mega | Work Circle-2 | External Project Division | Purnia | WBP Phase-2 | N/A |
207
| Construction of R.C.C H.L Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-11.011) 4x22.00m District of Sitamarhi. | Non-Mega | Work Circle-1 | Muzaffarpur | Sitamarhi | Nabard | N/A |
208
| Construction of H.L, R.C.C Bridge(3x25) with its approach road in 18th K.M. of Kadava - Sonouli Road in Purnia District.(Tirupati Balaji Earth Work Pvt. Ltd., A/230, P.C. Colony, Kankarbagh, Patna-800020)( PKG-14B ) | Non-Mega | Work Circle-2 | External Project Division | Purnia | WBP Phase-2 | N/A |
209
| Const. of 11x18.75m H.L.R.C.C Bridge over Parmar river on Diyari Ghat in between Dumariya to Diyari in the district of Araria Braj Kishor Construction. | Non-Mega | Work Circle-2 | Katihar | Araria | Plan | N/A |
210
| Construction of H.L, R.C.C Bridge(3X21) with its approach road in 5th K.M. of Jokihat - Dalmalpur road in the district of Araria.(Tirupati Balaji Earth Work Pvt. Ltd., A/230, P.C. Colony, Kankarbagh, Patna-800020)(PKG-15) | Non-Mega | Work Circle-2 | External Project Division | Araria | WBP Phase-2 | N/A |
211
| Construction of R.C.C H.L Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-11.695) 3x18.00m District of Sitamarhi. | Non-Mega | Work Circle-1 | Muzaffarpur | Sitamarhi | Nabard | N/A |
212
| Construction of H.L, R.C.C Bridge(1X33)with its approach road in 1st K.M. of Parsarma-chinkni road in the district of Supaul. (Lall Construction Co., AA-105, Shalimar Bagh, Delhi-110088)(PKG-16A) | Non-Mega | Work Circle-2 | External Project Division | Supaul | WBP Phase-2 | |
213
| Construction of R.C.C H.L Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-13.066) 2x25.00m District of Sitamarhi. | Non-Mega | Work Circle-1 | Muzaffarpur | Sitamarhi | Nabard | N/A |
214
| Construction of 6X24.00m H.L. R.C.C. Bridge over Bakra river at 1st km. of Udahat Tekni road under PLAN in the District of Araria. Tirupati Balajee Earth Work Pvt. Ltd. | Non-Mega | Work Circle-2 | Katihar | Araria | Plan | N/A |
215
| Construction of H.L, R.C.C Bridge(2X25) in 4th K.M. of Perserma-Chikni road in Palce of damaged Old S.P. Bridge (on Khardaha Dhar) in the district of Supaul. (Lall Construction Co., AA-105, Shalimar Bagh, Delhi-110088)(PKG-16B) | Non-Mega | Work Circle-2 | External Project Division | Supaul | WBP Phase-2 | |
216
| Construction of R.C.C H.L Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-22.730) 1x22.00m District of Sitamarhi. | Non-Mega | Work Circle-1 | Muzaffarpur | Sitamarhi | Nabard | N/A |
217
| Construction of H.L, R.C.C Bridge(2X28) with its approach road in 4th K.M. of Parsara-Chikni road (Bardwari Station-Simra road) in Place of damaged Old R.C.C. Bridge in the district of Supaul. (Lall Construction Co., AA-105, Shalimar Bagh, Delhi-110088)(PKG-16C) | Non-Mega | Work Circle-2 | External Project Division | Supaul | WBP Phase-2 | N/A |
218
| Construction of 3x16.50m H.L. R.C.C. Bridge including approach Road in 3rd Km. of Saifganj Road in the District of Araria. Shivdani Engineers Patna. | Non-Mega | Work Circle-2 | Katihar | Araria | Non-Plan | N/A |
219
| Construction of R.C.C H.L Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-26.675) 4x18.00m District of Sitamarhi. | Non-Mega | Work Circle-1 | Muzaffarpur | Sitamarhi | Nabard | N/A |
220
| Construction of H.L, R.C.C Bridge(3X28) with its approach road in 13th Km (2nd Cutting) Khurhan-Parel-Ratwara-Kapasia road in between Rudho-Mandal Tola and Pandit Tola in the district of Madhepura. (Extended part of RCD road 0 to 15 k.m.) {Brij Construction Pvt. Ltd., House No.-26, Nageshwar Colony, Kavi Raman Path, Boring Road, Patna-800001 (Bihar)}(PKG-17) | Non-Mega | Work Circle-2 | External Project Division | Madhepura | WBP Phase-2 | N/A |
221
| Construction of R.C.C H.L Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-45.166) 2x6.00m District of Sitamarhi. | Non-Mega | Work Circle-1 | Muzaffarpur | Sitamarhi | Nabard | N/A |
222
| Construction of H.L, R.C.C Bridge(3X33) in 11th K.M. of Baluwahat koshi bandh via Aghori-Sakra-Paharpur-Baghwa road in Place of SP Bridge in the district of Saharsa. (Devraha Construction Pvt. Ltd., Goutam Nagar, Ward No.-12, Saharsa-852201) (PKG- 18) | Non-Mega | Work Circle-2 | External Project Division | Saharsa | WBP Phase-2 | N/A |
223
| Construction of R.C.C H.L Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-46.812) 2x6.00m District of Sitamarhi. | Non-Mega | Work Circle-1 | Muzaffarpur | Sitamarhi | Nabard | N/A |
224
| Construction of H.L, R.C.C Bridge(2x25) with its approach road in 4th K.M. of Falka-Sripur-Bhawanipur-Karman Chowk road in the District of Purnea. {Basant Vanijya Limited, Lakhibagh, Manpur, Gaya-825003 (Bihar)} (PKG- 19 A) | Non-Mega | Work Circle-2 | External Project Division | Purnia | WBP Phase-2 | |
225
| Construction of R.C.C H.L Bridge Across Lakhandei River in Kanhauli to Sursand Vaya Sonbarsa Road under Indo-Nepal Border Road (Chainage-45.888) 2x6.00m District of Sitamarhi. | Non-Mega | Work Circle-1 | Muzaffarpur | Sitamarhi | Nabard | N/A |
226
| Construction of H.L, R.C.C Bridge(2X25) with its approach road in 25th K.M. of Falka-Sripur-Bhawanipur-Karman Chowk road (at Balia Ghat) in the District of Purnea.{Basant Vanijya Limited, Lakhibagh, Manpur, Gaya-825003 (Bihar)}(PKG-19B) | Non-Mega | Work Circle-2 | External Project Division | Purnia | WBP Phase-2 | |
227
| Construction of High Level RCC Bridge (3x16.50M) at 10.00th KM of Lalminiyan-Simraha Road in the district of Suapul including Approach road, Protection Work, in flood effected damage year 2017. Laxman Kumar - 9431383203 | Non-Mega | Work Circle-2 | Saharsa | Supaul | FDR | N/A |
228
| Construction of R.C.C H.L Bridge Approach Road in Bagmatti River Manderghat 24x24.75 m 2lane District of Sitamarhi. | Non-Mega | Work Circle-1 | Muzaffarpur | Sitamarhi | Nabard | N/A |
229
| Construction of High Level RCC Bridge (3x16.50M) at 6.60th KM of Gwalpada to Bihariganj Road at the place of Old Scrow Pile Bridge in the district of Madhepura, in flood effected damage year 2017. Manoj Kumar - 9470049418 | Non-Mega | Work Circle-2 | Saharsa | Madhepura | FDR | N/A |
230
| Construction of H.L, R.C.C Bridge(4X21) in 13th Km of Nasir Chowk Belwa Mazgama-Mongara road in the district of Araria.(Braj Kishore Roy, Village-Kamrgama, Post-Tira Jatmalpur, P.S-Kalyanpur, District-Samastipur-847301)(PKG-20) | Non-Mega | Work Circle-2 | External Project Division | Araria | WBP Phase-2 | N/A |
231
| Construction of H.L, R.C.C Bridge(2X25) with its approach road in 3rd K.M. of Supaul Station to Bariya Manch in the district of Supaul.(Tirupati Balaji Earth Work Pvt. Ltd., A/230, P.C. Colony, Kankarbagh, Patna-800020)(PKG-21A ) | Non-Mega | Work Circle-2 | External Project Division | Supaul | WBP Phase-2 | N/A |
232
| Construction of H.L, R.C.C Bridge(1X33) with its approach road in 3rd K.M. Sesouni-East Koshi Embankment (near Khakhi) in the district of Supaul.(Tirupati Balaji Earth Work Pvt. Ltd., A/230, P.C. Colony, Kankarbagh, Patna-800020)(PKG-21B ) | Non-Mega | Work Circle-2 | External Project Division | Supaul | WBP Phase-2 | |
233
| Construction of High Level RCC Bridge (3x21.75M) at 5.40th KM of Gwalpada to Bihariganj Road at the place of Old Scrow Pile Bridge including Approach Road, Protection work, in the district of Madhepura, in flood effected damage year 2017. (Pile Foundation) Shiv Krishna Builders Pvt.ltd. Mob - 9431268201 | Non-Mega | Work Circle-2 | Saharsa | Madhepura | FDR | N/A |
234
| Construction of H.L, R.C.C Bridge(1X21) with its approach road in Chandradei-Kamaldha-Paratha road along Laliahi Dhar in 2nd Km in the district of Araria.(Tirupati Balaji Earth Work Pvt. Ltd., A/230, P.C. Colony, Kankarbagh, Patna-800020)(PKG-22) | Non-Mega | Work Circle-2 | External Project Division | Araria | WBP Phase-2 | N/A |
235
| Construction of H.L, R.C.C Bridge(4X33) with its approach road in 15th Km in Khurhan-Parel-Ratwara-Kapasia road on Laliya Dhar in the district of Madhepura. (Extended part of RCD road 0 to 15 k.m.) {M/s Sri Ram Enterprises, 2nd Floor, Sri ram Tower, M.P.D.Road, Naya Bazar, Bhagalpur-812002 (Bihar)}(PKG-23) | Non-Mega | Work Circle-2 | External Project Division | Madhepura | WBP Phase-2 | N/A |
236
| Balance work (Approach Road) for Construction of H.L. RCC Bridge 14x18.75 m on gerua river near baisa village in Sanhaula-Baisa-Hanwara road in Sanhaula Block district Bhagalpur under Nabard loan project (RIDF-XVIII) M/s Sri Ram Enterprises, Bhagalpur. Mob.no. 9431422278 | Non-Mega | Work Circle-2 | Bhagalpur | Bhagalpur | Nabard | N/A |
237
| Construction of H.L, R.C.C Bridge(4X33) with its approach road in 15th K.M. of Ranginiya-Sonbarsa Road in Palce of Old S.P. Bridge in the district of Saharsa. (Lall Construction Co., AA-105, Shalimar Bagh, Delhi-110088) (PKG-24) | Non-Mega | Work Circle-2 | External Project Division | Saharsa | WBP Phase-2 | |
238
| Construction of H.L, R.C.C Bridge(7X33) with its approach road in 5th K.M. of Chhatapur-Girdharpu-Chunni road in the district of Supaul.(Lall Construction Co., AA-105, Shalimar Bagh, Delhi-110088)(PKG-25) | Non-Mega | Work Circle-2 | External Project Division | Supaul | WBP Phase-2 | |
239
| Construction of 2x10.37M size Bridge over Canal to Siman chakjamal Siman Road in ward No. 33 of Vaishali District | Non-Mega | Work Circle-1 | Muzaffarpur | Vaishali | MMSNY | N/A |
240
| Construction of H.L, R.C.C Bridge(7X25) with its approach road in 2nd K.M. of Mehadipur-Fatehpur on river surser (Near wooden Bridge) road in the district of Supaul.(Tirupati Balaji Earth Work Pvt. Ltd., A/230, P.C. Colony, Kankarbagh, Patna-800020)(PKG-26 ) | Non-Mega | Work Circle-2 | External Project Division | Supaul | WBP Phase-2 | N/A |
241
| Balance work (Approach Road) for Constriction of H. L. R.C.C. Bridge 12X24.75m in Khrik Chorhar road at chorhar ghat of old kosi river branch in kharik Block District Bhagalpur under Nabard loan project (RIDF-XVII) M/s Rajiv Kumar Singh, Kharik, Bhagalpur. Mob.no. 9934095945 | Non-Mega | Work Circle-2 | Bhagalpur | Bhagalpur | Nabard | N/A |
242
| Construction of H.L, R.C.C Bridge(2X33) with its approach road in 11th K.M. of Sonbarsa-Gwalpara Road in Palce of Old S.P. Bridge in the District of Saharsa. (M/s Jai Mata Di Construction, Shri Krishnapuri (South), Begusarai (Bihar)-851101)(PKG27-)A | Non-Mega | Work Circle-2 | External Project Division | Saharsa | WBP Phase-2 | N/A |
243
| Re-setting, Repairing and maintainence work of 28 sets module of Pontoon bridge on Koshi river at Vijay Ghat between Naugachhia & Dholbajja for the Year 2017-22 M/s Shailesh Kumar, Gopal Goshala, Nogachia, Bhagalpur. Mob No. 9431871130 | Non-Mega | Work Circle-2 | Bhagalpur | Bhagalpur | Plan | |
244
| Construction of H.L, R.C.C Bridge(4X28) with its approach road in 17th K.M. of Sonebarsa-Gwalpara road (1st Cutting) in the district of Saharsa. (M/s Jai Mata Di Construction, Shri Krishnapuri (South), Begusarai (Bihar)-851101)(PKG-27-B) | Non-Mega | Work Circle-2 | External Project Division | Saharsa | WBP Phase-2 | N/A |
245
| "Constraction of HL RCC Bridge (2x14.50) over Canal at Baildour in south of Choutham Basa(Banni Basa) village in Kasnagar Panchayat under MMSNY in saharsa distt. Sulekha Devi 9939775544" | Non-Mega | Work Circle-2 | Saharsa | Saharsa | MMSNY | N/A |
246
| Construction of H.L, R.C.C Bridge(2X28) with its approach road in 17th K.M. of Sonebarsa-Gwalpara road (2nd Cutting) in the district of Saharsa. (M/s Jai Mata Di Construction, Shri Krishnapuri (South), Begusarai (Bihar)-851101)(PKG27 -C) | Non-Mega | Work Circle-2 | External Project Division | Saharsa | WBP Phase-2 | N/A |
247
| Construction of High Level RCC Bridge with Approach Road and protection Work in 6th Km of Sanhaula- Hanwara Road near Vaisa Village in place of damage S.P. Bridge in the District of Bhagalpur | Non-Mega | Work Circle-2 | Bhagalpur | Bhagalpur | Plan | N/A |
248
| Construction of High Level RCC Bridge (3x24.75M) at 3.85th KM of Balthi Musharniyan viya N.H.-107 Road in the district of Saharsa including Approach road, Protection Work, Diversion Work. Shashi Ranjan 7488173962 | Non-Mega | Work Circle-2 | Saharsa | Saharsa | FDR | N/A |
249
| Construction of H.L, R.C.C Bridge(1X37.5) with its approach road in 8th K.M. of Simri-Bakhtiyarpur-Salkhua road in Place of damaged Old S.P. Bridge in the district of Saharsa.(M/s Trimurti Engicons and Traders Pvt. Ltd., C/o Srikant Choudhary, Tatma Toli, Rajaban, Near Chath Pokhar, Purnea-854301)(PKG-30) | Non-Mega | Work Circle-2 | External Project Division | Saharsa | WBP Phase-2 | N/A |
250
| Construction of High Level RCC Bridge (2x16.50M) at 3rd KM of Balthi Musharniyan viya N.H.-107 to Bund Road in the district of Saharsa including Approach road, Protection Work, in flood effected damage year 2017 Balram Singh-9431082277 | Non-Mega | Work Circle-2 | Saharsa | Saharsa | FDR | N/A |
251
| Construction of H.L. R.C.C. Bridge(1X21)with its approach road in 3rd K.m of Belgachhi-Chandpur to Rouniya-Kanharia road in the district of Purnia.{Basant Vanijya Limited, Lakhibagh, Manpur, Gaya-825003 (Bihar)}(PKG-33) | Non-Mega | Work Circle-2 | External Project Division | Purnia | WBP Phase-2 | N/A |
252
| Construction of H.L, R.C.C Bridge(2X28)with its approach road in 14th K.M. of Chaudhara-Amha-Lokha-Saharsa road in Place of damaged Old R.C.C Bridge in the district of Saharsa.(Sincon Infrastructure Pvt. Ltd., S.K Puri, LG-1 & 2, Majestic Plaza, West Boring Canal Road, Patna-800001)(PKG-32) | Non-Mega | Work Circle-2 | External Project Division | Saharsa | WBP Phase-2 | |
253
| Construction of HLRCC Bridge over River Khalkhaliya at land of Jaychand Yadav khutaha Panchayat of Bhagalpur District Under MMSNY Scheme 4 X 16.50 m M/s Hardev Const. Pvt. Ltd., Station Road, B, Deoghar (Jharkhand) Mob.no. 9006024148 | Non-Mega | Work Circle-2 | Bhagalpur | Bhagalpur | MMSNY | N/A |
254
| Construction of HLRCC Bridge over Laxamipur Dhar in Gosai Gawan Panchayat Gopalpur Block of Bhagalpur District Under MMSNY Scheme 7 X 21.75 m M/s Hardev Const. Pvt. Ltd., Station Road, B, Deoghar (Jharkhand) Mob.no. 9006024148 | Non-Mega | Work Circle-2 | Bhagalpur | Bhagalpur | MMSNY | N/A |
255
| Construction R.C.C. Bridge(7X25) with its approach road in Dubhari-Chakla Ghat to Kosi Embankment road (Near Spur) on 57.20 R.D. of Kosi Embankment in the district of Supaul. {Vishwanath Sharma, Vill. + P.O.- Rahua, P.S.-Rosera, District- Samastipur-848210 (Bihar)}(PKG-34 ) | Non-Mega | Work Circle-2 | External Project Division | Supaul | WBP Phase-2 | N/A |
256
| Construction of H.L., R.C.C. Bridge(4X25) with its approach road over Tilyuga river in Parrari-Kadmaha road in Marona Block in the District of Supaul. {Shiv Kishore Construction, At-Saidnagar, Opposite Petrol Pump, Laheriasarai, Darbhanga-846001 (Bihar)}( PKG-35 A) | Non-Mega | Work Circle-2 | External Project Division | Supaul | WBP Phase-2 | N/A |
257
| Construction of H.L.R.C.C Bridge over river kiul in 5th km of jamui-kawakol-ropawel missing link road in Jamui district. ( Balance Work ) Balkrishna Bhalotia Const. Pvt.Ltd., Jamui Bazar, Jamui. Mob.no. 9431234037 | Non-Mega | Work Circle-2 | Bhagalpur | Jamui | Plan | N/A |
258
| Construction of H.L., R.C.C. Bridge(4X25) with its approach road over Tilyuga river Hariyahia-Haripur village road near Islampur village in the District of Supaul. {Shiv Kishore Construction, At-Saidnagar, Opposite Petrol Pump, Laheriasarai, Darbhanga-846001 (Bihar)}(PKG-35 B) | Non-Mega | Work Circle-2 | External Project Division | Supaul | WBP Phase-2 | N/A |
259
| Construction of H.L. R.C.C. Bridge(3X25) in place of Screw Pile Bridge with its approach road in Veena-Bela-Jhura-Amha road over Tilave river in the district of Supaul. (Balram Singh, S/o Late Surendra Nath Singh, At+Post-Patory (Panchgachiya), District-Saharsa-852124)(PKG-37A) | Non-Mega | Work Circle-2 | External Project Division | Supaul | WBP Phase-2 | N/A |
260
| Construction of H.L., R.C.C. Bridge(3X75) with its approach road over Khardaha river near Bela village (South) in Lokha-Veena road (Link of Ekma Hault) in the district of Supaul. (Balram Singh, S/o Late Surendra Nath Singh, At+Post-Patory (Panchgachiya), District-Saharsa-852124)( Pkg-37B ) | Non-Mega | Work Circle-2 | External Project Division | Supaul | WBP Phase-2 | N/A |
261
| Construction of H.L., R.C.C. Bridge(4X25)with its approach road over Tilyuga river besides screw pile bridge in Kewtapatti-Nirmali Bazar road in Nirmali Block in the district of Supaul. (Devraha Construction Pvt. Ltd., Goutam Nagar, Ward No.-12, Saharsa-852201)(PKG-38 A) | Non-Mega | Work Circle-2 | External Project Division | Supaul | WBP Phase-2 | N/A |
262
| Construction of H.L., R.C.C. Bridge(3X25) with its approach road over Tilyuga river in Theho village-Sonapur road in Dagmara Panchyat of Nirmali block in the District of Supaul.(Devraha Construction Pvt. Ltd., Goutam Nagar, Ward No.-12, Saharsa-852201)(PKG-38 B) | Non-Mega | Work Circle-2 | External Project Division | Supaul | WBP Phase-2 | N/A |
263
| Construction of H.L., R.C.C. Bridge(2X25)with its approach road in Basba Gaon in Basbitti Panchyat near 62.6 R.D of Kosi Embankment in the District of Supaul.Pkg-39 (Devraha Construction Pvt. Ltd., Goutam Nagar, Ward No.-12, Saharsa-852201)(PKG-39 ) | Non-Mega | Work Circle-2 | External Project Division | Supaul | WBP Phase-2 | N/A |
264
| Construction of H.L., R.C.C. Bridge(5X25) with its approach road over Tilyuga river at Barmotra Ghat in the Manga Sihaul road to Barmotra under Marona block in the District of Supaul.{Mukesh Kumar Singh, At-Ekderwa Masuria, P.O.-Maker, Saran-841215 (Bihar)}(PKG040) | Non-Mega | Work Circle-2 | External Project Division | Supaul | WBP Phase-2 | N/A |
265
| "Construction of High Level RCC Bridge (2x16.50M) at 1st KM of Fatehpur-Kashnagar Road in the district of Saharsa including Approach road, Protection Work in flood effected damage year 2017 Balram Singh-9431082277" | Non-Mega | Work Circle-2 | Saharsa | Saharsa | FDR | N/A |
266
| Construction of H.L, R.C.C Bridge(3X25) with its approach road in along Kakurwa Dhar in 24th Km of Chandradei-Bangama-paktola-Matiary-Mongra road in the district of Araria.{Nirman Engicons Pvt. Ltd., At + P.O.- Mohanpur, District-Begusarai (Bihar)-851131}(PKG41) | Non-Mega | Work Circle-2 | External Project Division | Araria | WBP Phase-2 | |
267
| "Construction of High Level RCC Bridge (3x16.50M) at 5th KM of Balthi Musharniyan Road in the district of Saharsa including Approach road, Protection Work, in flood effected damage year 2017 Arju Construction - 9304026134" | Non-Mega | Work Circle-2 | Saharsa | Saharsa | FDR | N/A |
268
| "Construction of High Level RCC (4x18.75) Bridge over river Tilawe in Supaul Block of Jhahura Village Near Mehata Tola in the district of Supaul (NABARD) Shankar Sharma 9934756142 " | Non-Mega | Work Circle-2 | Saharsa | Supaul | Nabard RWD | N/A |
269
| Construction of H.L, R.C.C Bridge(3X37.5)with its approach road in Khurhan-Parel-Ratwara-Kapasia road Ratwara-Bazar to South Iron Screw Pile Bridge (3x37.5M) from East in Madhepura District. (Lall Construction Co., AA-105, Shalimar Bagh, Delhi-110088)(PKG-43) | Non-Mega | Work Circle-2 | External Project Division | Madhepura | WBP Phase-2 | N/A |
270
| "Construction of High Level RCC Bridge (6x18.75) Marauna block of Ganaura PWD Road to Maharaji Tola in the district of Supaul (NABARD) Manoj Kumar - 9470049418" | Non-Mega | Work Circle-2 | Saharsa | Supaul | Nabard RWD | N/A |
271
| Construction of 6X24.00M H.L.R.C.C Bridge in 11th km. of Muraligach-Thakurganj Road over Chenga river at Chenga Ghat in Kishanganj District. [Shiv Kishore Construction] | Non-Mega | Work Circle-2 | External Division-2 (Kishanganj) | Kishanganj | Plan | |
272
| "Constraction of HL RCC (6x18.00M) Bridge on tilyuga River in 1st KM of Lalminia-simraha road under Plan Head Marouna block in supaul distt. Raj Construction 9430883767" | Non-Mega | Work Circle-2 | Saharsa | Supaul | Plan | N/A |
273
| "Construction of High Level RCC Bridge (4x24.75M) at 8.80th KM of Lalminiyan-Simraha Road in the district of Suapul including Approach road, Protection Work. Braj Kishor Ray 9430800861" | Non-Mega | Work Circle-2 | Saharsa | Supaul | FDR | N/A |
274
| Construction of H.L. R.C.C. Bridge (21x24.75 m) over Koul River in Jurail Laucha Road of RWD Road in the District of Kishanganj. [Navin Chandra Sarkar] | Non-Mega | Work Circle-2 | External Division-2 (Kishanganj) | Kishanganj | Nabard RWD | N/A |
275
| "Construction of High Level RCC Bridge (4x24.75M) at 19th KM of Nirmali-Marauna-Madhepur Road in the district of Suapul including Approach road, Protection Work, in flood effected damage year 2017. Shashi Ranjan 7488173962" | Non-Mega | Work Circle-2 | Saharsa | Supaul | FDR | N/A |
276
| "Construction of High Level RCC Bridge (3x16.50M) at 2.70th KM of Lalminiyan-Simraha Road in the district of Suapul including Approach road, Protection Work, in flood effected damage year 2017. Haqu Construction Mob - 9955334076 & 7667383440" | Non-Mega | Work Circle-2 | Saharsa | Supaul | FDR | N/A |
277
| Construction of ROB Bariyarpur in Lieu of LC No. 15BT at km 347/10-12 Between Bariyarpur, Jamalpur Station of Kharagpur-Bariyarpur-Munger road District of Munger Under PLAN. ( Balance Work ) Bhabesh Mishra Construction Pvt. Ltd. Nayachak, Near Budhia Kali Asthan, Isakchak, Bhagalpur. Mob.no. 9470627503 | Non-Mega | Work Circle-2 | Bhagalpur | Munger | ROB | N/A |
278
| Construction of 13.00Km(Approx) long extended portion of Approach road of Baluaha Ghat Kosi Bridge between Baluahaghat to Gandaul upto Biraul (Hanti Kothi) in Saharsa/Darbhanga district of Bihar [GAMMON INDIA LIMITED] | Mega | Work Circle-2 | Darbhanga | Darbhanga | Nabard | |
279
| Construction of HL RCC Bridge on Kosi River between Baluaha Ghat and Gandaul under RIDF-XV [S.P.Singla Constructions Pvt. Ltd.] | Mega | Work Circle-2 | Darbhanga | Darbhanga | Nabard | |
280
| Construction of H.L.R.C.C. 7 x 18.75 m Bridge over river Punpun with approach road, Protection work and Miscellaneous work in between Khudwa - Kalen village in Aurangabad District Under MMADY Scheme. (JAI MATA DI ROAD CONSTRUCTION PVT. LTD., PATNA,09431427109) | Non-Mega | Work Circle-1 | Gaya | Aurangabad | MMADY | N/A |
281
| "Construction of 4- Lane H.L.R.C.C Bridge (58x50) in between Daudnagar- Nasriganj over Sone river. M/s. Hindustan Construction Co. Ltd."(09546390088) | Mega | Work Circle-1 | Gaya | Aurangabad | Nabard | |
282
| construction of HL RCC Bridge 12x24.75M on Harohar river near surjichak village at Pipriya Block IN Lakhisarai district. ( RAM KRIPAL SINGH CONSTRUCTION Mob.- 9810813322) | Non-Mega | Work Circle-2 | Nalanda | Lakhisarai | Plan | N/A |
283
| "Construction of H.L. RCC bridge (24x60m span) in the 27th KM of chakiya kesaria sattarghat road over river Gandak . M/S Vasishta Construction Pvt Ltd. Ph- 09849767222" | Mega | Work Circle-1 | Champaran(Motihari) | East Champaran(Motihari) | Nabard | N/A |
284
| "Construction of 2 - Lane Approach Road Connectivity to Newly Constructed H.L. Bridge (42x44M) Over River Gandak between Dhanha Ghat to Ratwal Ghat (Approx Length 15 Km in the District of West Champaran, Bettiah (Bihar). UJJAIN ENGICON INDIA PVT. LTD. " | Mega | Work Circle-1 | Champaran(Motihari) | Pachim Champarn | Plan | N/A |
285
| Construction of (3x21.00m) size H.L. R.C.C. Bridge work beside of 2nd minor bridge in the approach road of Constructed H.L. RCC Bridge over river Gandak between Gopalganj-Bettiah (Bishunpur Panchayat) Pile Foundation (Within A/A of Gopalganj vishnupur main project) | Mega | Work Circle-1 | Champaran(Motihari) | Pachim Champarn | Others | N/A |
286
| Construction of Flyover connecting Mithapur flyover to Bhikhari Thakur (Yarpur) Flyover via R.Block Juction including approach road, retaining wall, service road, elevated rotary & electrification etc in Patna Town. (Rachna Construction Co. Bharuch Gujrat-16) | Mega | Work Circle-1 | Patna-1 | Patna | Plan | |
287
| Construction of Flyover (2+2 lane of Carriage way 5.5 m) from Mithapur ROB to Chiraiuatand Flyover via station Road (854m eleveted 207m ramp) and extension of Chiraiyatand Flyover (1+2 lane Carriageway 7.5m) upto Gandhi Maidan in exhihition road (612 elevated + 147m field up) in Patna town in the state of Bihar. S.P. Singla Construction, 011-42143697, 09501688799 | Mega | Work Circle-1 | Patna-1 | Patna | Additional Central Assistance | N/A |
288
| Construction of Pontoon Bridge in U/S & D/S parallel to Mahtma Gandhi Setu under Patna district. Length- 2x1500 m Length Approach- 5000 m(Srishti Developers Pvt.Ltd,Patna)) | Mega | Work Circle-1 | Patna-1 | Patna | Plan | N/A |
289
| Construction of H.L. R.C.C Bridge over River in Ganga between Ara (NH- 30) & Chapra (NH- 19) Via Babura Doriganj S.D.B./S.P.S. (J.V.) 9386240810 | Mega | Work Circle-1 | Ara | Ara | Plan | |
290
| Construction of 3- Lane H.L. RCC bridge in Bangra Ghat conecting SH- 74 (Muzafarpur District) & SH- 90 (Saran District) over river Gandak including approach road . S.p Singla Contrucation, 011-42143697, Ph- 09501688799 | Mega | Work Circle-1 | Muzaffarpur | Muzaffarpur | Nabard | |
291
| Construction of HLRCC bridge with Land acquisition ,approach road and protection work in tilyuga river between dwalak village and janki nagar tola under madhepur block in the district of madhubani (5x18.75 m)Shreem Construction,9470627503 | Non-Mega | Work Circle-2 | Darbhanga | Madhubani | BDF | N/A |
292
| Construction of five no.of lock gate in the road between jhaveri chowk and bhutaha chowk in chainage from 17.645 km to 25.19 km in madhubani district.Brajendra Kr. Buildress Pvt.Ltd,0612-2276467,9431063085 RCD | Non-Mega | Work Circle-2 | Darbhanga | Madhubani | Nabard | N/A |
293
| costruction of HLRCC bridge in NH-28 through chand chourdih to pathan tol before river under ujiyarpur block (2x14.50).Sri Rajesh Kumar,94308343626 | Non-Mega | Work Circle-2 | Darbhanga | Samastipur | MMSNY | |
294
| Construction of of H.L. RCC bridge (3X18.75 m) in 2nd km. of Araria Meerganj Chowk Kuwari Bypass Skiti Dhabeli road under FDR in the District Araria. SHIV CHANDRA KUMKAR | Non-Mega | Work Circle-2 | Katihar | Araria | FDR | N/A |
295
| Construction of (1) Boundary Wall (2) Road Development (3) Drainage (4) Electric Light-High Mask/Road light (5) Repair of Administrative Building if any (6) Toilet Block of Krishi Bazar Samiti Daudnagar in the district of Aurangabad.(NNT Developers Pvt.ltd,Mob.No.-7766916461) | Non-Mega | Work Circle-1 | Gaya | Aurangabad | Plan | |
296
| Construction of Boundry Wall of Karpuri hostel under Kishanganj District.Ganesh Contruction Araria | Non-Mega | Work Circle-2 | External Division-2 (Kishanganj) | Kishanganj | Non-Plan | |
297
| Repair of Pre Stress Girder Bridge (10 Span) over river Mahananda in 8th km of Kishanganj - Bahadurganj road near Mastan Chowk in the District of Kishanganj. [Rebuild Struct Associates, Mumbai] | Non-Mega | Work Circle-2 | External Division-2 (Kishanganj) | Kishanganj | Plan | N/A |
298
| Construction of Marketing yard in the district of Begusarai with boundary wall, Road work, Drain work, Guard Room, High Mast Light & Toilet Work . M/S Classicon Construction (l) Ptd., 9431018303 | Non-Mega | Work Circle-2 | Khagaria | Begusarai | Plan | |
299
| Construction of (1)Boundary Wall (2) Road Development (3) Drainage (4) Electric Light-High Mask/Road light (5) Repair of Administrative Building if any (6) Toilet Block of Krishi Bazar Samiti Motihari in the district of East Champaran. | Non-Mega | Work Circle-1 | Champaran(Motihari) | East Champaran(Motihari) | Agriculture | |
300
| Construction of (1)Boundary Wall (2) Road Development (3) Drainage (4) Electric Light-High Mask/Road light (5) Repair of Administrative Building if any (6) Toilet Block of Krishi Bazar Samiti Bettiah in the district of West Champaran. | Non-Mega | Work Circle-1 | Champaran(Motihari) | Pachim Champarn | Agriculture | |
301
| Construction of (1) Boundary Wall (2) Road Development (3) Drainage (4) Electric Light-High Mask/Road light (5) Repair of Administrative Building if any (6) Toilet Block of Krishi Bazar Samiti in the District of Gaya.(NNT Developers Pvt.Ltd,Mob.No.-7766916461) | Non-Mega | Work Circle-1 | Gaya | Gaya | Plan | |
302
| Construction of 4 Lane H.L.R.C.C. Bridge (35x52.55m) 1.84Km & Approach Road 10.87KM & Guide Bunds at Vijay Ghat, Naugachia over rover Kosi in the district of Bhagalpur, Bihar S.P.Singla Construction Pvt. Ltd. | Mega | Work Circle-2 | Bhagalpur | Bhagalpur | Nabard | N/A |
303
| Construction of High Level RCC Bridge (3x18.0)m in 40th K.M. of Bhabhua Adhaura Road (At Tala Village) across Suara River in Kaimur (Bhabhua) District.Jai Mata Dee & Maa sita construction | Non-Mega | Work Circle-1 | Ara | Kaimur(Bhabua) | Plan | |
304
| Construction of Multi Cell Box Culvert of 3 x 7.020 m Over Bagahi Canal near Proposed Power Sub - Station of Power Grid Corporation of India in Sherghati Block of Gaya District. (Satyendra Kumar Yadav, Gaya) | Non-Mega | Work Circle-1 | Gaya | Gaya | Others | N/A |
305
| Construction of H.L.R.C.C. 19 x 18.00 m Bridge inplace of damaged bridge Over Falgu River at Ratan Bigha Village including approach road, Protection work, Diversion Work and Miscellaneous work in 16th K.M. of Ghoshi-Islampur-Giriyak Road in Jehanabad District.(R.A.S ENTERPRISES PVT.LTD,PATNA,099346616231) | Non-Mega | Work Circle-1 | Gaya | Jehanabad | Plan | |
306
| Construction of H.L.R.C.C. 7 x 16.50 m Bridge including approach road, Protection work and Miscellaneous work over Punpun River between Shahganj & Gohra in Kurtha Block of Arwal District Under NABARD Scheme.(M/S LAXMAN KUMAR,PATNA,09431383203) | Non-Mega | Work Circle-1 | Gaya | Arwal | Nabard RWD | N/A |
307
| Construction of High Level R.C.C. Bridge (5x18.00 Mtr.) with approach road and Protection work on 4.05 KM of Manuapul - Yogapatti-Nawalpur-Ratwal Road over Tirhut Canal in the District of West Champaran, Bridge Length - 93.00 Mtr. Pile Foundation. | Non-Mega | Work Circle-1 | Champaran(Motihari) | Pachim Champarn | CRF | N/A |
308
| Construction of (3x21.00m) size H.L. R.C.C. Bridge work beside of 2nd minor bridge in the approach road of Constructed H.L. RCC Bridge over river Gandak between Gopalganj-Bettiah (Bishunpur Panchayat) Pile Foundation M.K. Enterprises Ph. No. 9431212686 | Non-Mega | Work Circle-1 | Champaran(Motihari) | Pachim Champarn | Nabard | N/A |
309
| Construction of High Level RCC bridge(3x18.75m) over river Gangi in lieu of Damaged Balbatra Lakri pul at Ward No-03 in Ara Block in the District of Bhojpur (Ara).(SUDHIR KUMAR SINGH) | Non-Mega | Work Circle-1 | Ara | Ara | Plan | N/A |
310
| Construction of H.L. R.C.C. 2x20.00 mtr. In the district of West Champaran under Indo-Nepal Border Ch. 5.819 km. Near Inerwa Bazar. Pile Foundation M/S Sheel Construction(Indo-Nepal) | Non-Mega | Work Circle-1 | Champaran(Motihari) | East Champaran(Motihari) | Nabard | |
311
| Construction of Approach to Rail-cum-Road Bridge across river Ganga at Digha-Ghat near Sonepur in State of Bihar (Phase-I)(S.P.Singla Construction Pvt.ltd,Panchkula Haryana)) | Mega | Work Circle-1 | Patna-1 | Saran | Plan | N/A |
312
| Construction of Approach to Rail-cum-Road Bridge across river Ganga at Digha-Ghat near Sonepur in State of Bihar (Phase-II)(S.P.Singla Construction Pvt.ltd,Panchkula Haryana) | Mega | Work Circle-1 | Patna-1 | Saran | Plan | |
313
| Construction of left turning ramp 9 Extra Arm) connecting Newly constructed Mithapur-Chiraiyatand via Railway Station Flyover (P30-P31) with Chiraiyatand Exhibition Road Flyover in Patna.(S.P.SINGLA CONSTRUCTION PVT.LTD.,PANCHKULA,HARYANA) | Non-Mega | Work Circle-1 | Patna-1 | Patna | Plan | |
314
| Construction of H.L. R.C.C. Bridge (6x18.00m) in place of damaged bridge in 12th Km of Pali-Ullar-Masaudhi Road under Pali Block in the district of Patna.(SATYENDRA KR.YADAV,RAMPUR,GAYA) | Non-Mega | Work Circle-1 | Patna-1 | Patna | Plan | N/A |
315
| Construction of H.L. R.C.C. Bridge (6x18.00m) over river Punpun between Nashopur (Naubatpur Block) Poaawan Ghat (Masaudhi Block) in Kahaguri-Khaurat Road in the district of Patna.(PRABHAT KUMAR,PATNA) | Non-Mega | Work Circle-1 | Patna-1 | Patna | Plan | |
316
| Construction of Accomodation with toilet facility for Pataients and their attendents in the campus of Indira Ghandhi Institute of Medical Sciences (IGIMS) Patna (Total Area 2712sqft) | Non-Mega | Work Circle-1 | Patna-1 | Patna | Plan | N/A |
317
| Construction of Incubation Centre I.I.T. Patna (Bihta)(KALSHI BUILDCON PVT.LTD.,HINOO,RANCHI,JHARKHAND) | Non-Mega | Work Circle-1 | Patna-1 | Patna | Others | N/A |
318
| (a) Construction of Jan Nayak Karpuri Chhatrawas (Hostel) in district Patna.(RAMESH KUMAR,PATNA) | Non-Mega | Work Circle-1 | Patna-1 | Patna | Welfare Department | |
319
| (b) Construction of Jan Nayak Karpuri Chhatrawas Chahar Diwari (Hostel) in district Patna.(RAMESH KUMAR,PATNA) | Non-Mega | Work Circle-1 | Patna-1 | Patna | Welfare Department | |
320
| Construction of H.L. RCC Bridge over Chanha River at Chhanch Ghat in 3rd km. of Bishanpur-Sumbha Road of Khagaria District.Sri BRAJKISHOR RAY,SAMASTIPUR,9430800861 | Non-Mega | Work Circle-2 | Khagaria | Khagaria | Plan | |
321
| Construction of H.L. R.C.C.-P.S.C Bridge with its approach road in 3rd Km of Baluwahat Kosibandh via Aghori-Sakra-Paharpur-Baghwa road in the district of Saharsa.(PKG-13 ) (M/s Jai Mata Di Construction, Shri Krishnapuri (South), Begusarai (Bihar)-851101) | Non-Mega | Work Circle-2 | External Project Division | Saharsa | WBP Phase-2 | N/A |
322
| Construction of H.L. R.C.C.-P.S.C. Bridge with its approach road in 9th K.m of Sour-Patarghat road in the district of Saharsa.(PKG-29 ) (M/s Jai Mata Di Construction, Shri Krishnapuri (South), Begusarai (Bihar)-851101) | Non-Mega | Work Circle-2 | External Project Division | Saharsa | WBP Phase-2 | N/A |
323
| Balance work (Approach Road) for Construction of H.L.RCC Bridge 14x18.75m on gerua river near baisa village in Sanhaula-Baisa-Hanwara road in Sanhaula Block district Bhagalpur under Nabard loan project (RIDF-XVIII) M/s Sri Ram Enterprises, Bhagalpur Mob. No. 9431422278 | Non-Mega | Work Circle-2 | Bhagalpur | Bhagalpur | Nabard | RIDF-18 (RCD) |
324
| Construction of H.L.R.C.C Bridge 3x16.00m with diversion, Protection work , dismantling work and Approach Road in the 20th km of Sheikhpura –Arha Road. | Non-Mega | Work Circle-2 | Nalanda | Sheikhpura | Plan | N/A |
325
| Protection Work of Piers of High Level RCC Bridge 18 x 24.75 m in Kiul river between Maliya Nagardar & Tetarhat Block- Ramgarhchowk in Dist- Lakhisarai. Contractor - Praphulla Kumar | Non-Mega | Work Circle-2 | Nalanda | Lakhisarai | Nabard | N/A |
326
| Construction of H.L. R.C.C. Bridge 8 x 18mtr. In place of Old Screw pile bridge connecting Rajauli Bazar to NH 31 across river Dhanarjay Under Block - Rajauli in Dist. Nawada. M/s K. ANDI & ASS0CIATES Mob. - 7004501271 | Non-Mega | Work Circle-2 | Nalanda | Nawada | Plan | N/A |
327
| Construction of High Level R.C.C. Bridge in 3.8th k.m. (3x21.00m) of Kusheshwarsthan to Phultora road in the District of Darbhanga.(Braj Kishore Rai,09430800861) | Non-Mega | Work Circle-2 | Darbhanga | Darbhanga | Plan | |
328
| Construction of H.L. RCC Bridge over River Durgawati at Gorsara Village at Ramgarh Block from H.Q to Parsathua N.H-30 in the District of Kaimur(JAWAHAR LAL YADAV) | Non-Mega | Work Circle-1 | Ara | Kaimur(Bhabua) | Nabard RWD | N/A |
329
| CONSTRUCTION OF PROPOSED H.L RCC BRIDGE ON KARMANASA RIVER, AT CHAINPURA VILLAGE ( ADHAURA), IN KAIMUR DISTRICT(ALOK KUMAR) | Non-Mega | Work Circle-1 | Ara | Kaimur(Bhabua) | Nabard RWD | |
330
| Construction of High Level RCC Bridge 5x18.75 M in Goraipur Village over River Durgawati in Bhabhua Block in Kaimur (Bhabhua) District.(BASANT VANIJYA LTD.) | Non-Mega | Work Circle-1 | Ara | Kaimur(Bhabua) | Nabard RWD | |
331
| Construction of four lane H.L. RC Bridge (1x16.00) in place of Damaged Bridge at 27th Km of Ara-Sasaram Road near Charpokhari Thana under Bhojpur District.(VISHWANATH SHARMA) | Non-Mega | Work Circle-1 | Ara | Ara | Plan | N/A |
332
| Construction of H.L.R.C.C. Bridge (3x21.00M) at Ch.- 19.8 Kuseshwarasthan to Phultora in the district of Darbhanga.(Balram Singh,09431082277) | Non-Mega | Work Circle-2 | Darbhanga | Darbhanga | Plan | |
333
| Construction of H.L.R.C.C. Bridge (5x21.00M) at Ch.- 18th Kusheshwarasthan to Phultora in the district of Darbhanga.(B.K.Builders Pvt.Ltd,09955056922) | Non-Mega | Work Circle-2 | Darbhanga | Darbhanga | Plan | |
334
| patna pul | Non-Mega | Work Circle-2 | Darbhanga | Samastipur | Nabard RWD | N/A |
335
| Construction of Renovation work NH Division office of RCD, Rajbanshi Nagar, Patna | Non-Mega | Work Circle-1 | Patna-1 | Patna | Non-Plan | N/A |
336
| Construction of H.L. R.C.C. bridge over River Dardha between Hospital More and Horilganj on N.H.-83 inplace of old bridge in the District of Jehanabad.(Satyendra Kumar Yadav, Gaya-9801850421) | Non-Mega | Work Circle-1 | Gaya | Jehanabad | Plan | |
337
| Construction of H.L. R.C.C. bridge with approach road in Mamka More to Jakhim Railway Station Road in Rafiganj Block of Aurangabad District. (M/s. Sanjay Construction Co., Patna-9835049094) | Non-Mega | Work Circle-1 | Gaya | Aurangabad | Plan | |
338
| Construction of H.L. R.C.C. bridge with approach road in 7th K.M. of Tetariya More to Koiridih Road in Aurangabad District. (M/s K.Andi & Associates, Gaya-7004501271) | Non-Mega | Work Circle-1 | Gaya | Aurangabad | Plan | |
339
| Construction of H.L. R.C.C. bridge with approach road over Morhar River in Pai Bigha - Ghejan Road in Jehanabad District. (M/s. Shailendra Singh, Gaya-7739131191) | Non-Mega | Work Circle-1 | Gaya | Jehanabad | Plan | |
340
| Construction of High Level RCC Bridge (5x21.00M Well Foundation) including Approach Road & Protection Work at 8.00 KM of Thalha to N.H. - 57 Road via Deepnagar, Fulkahi, Ramvishnupur in the District of Suapul. Contractor - Bipin Kumar Singh, Mob. No.- 9431228914 | Non-Mega | Work Circle-2 | Saharsa | Supaul | Plan | |
341
| Construction of High Level RCC Bridge (16x18.00m) Size in 14th km of Manjhay-Govindpur Road in Distritct of Nawada. M/s K. ANDI & ASS0CIATES Mob. - 7004501271 | Non-Mega | Work Circle-2 | Nalanda | Nawada | Plan | N/A |
342
| Strengthing of Barun-Navinagar Road from Chainage 0.00 K.M. to 35.10 K.M. (Total length-35.10 K.M.) including earth work, road crust work, cross drainage work, R.C.C. drain work and misc. work in Aurangabad District. (M/s. Jai Mata Dee and Maa Sita Construction, Rohtas-9934462616) | Non-Mega | Work Circle-1 | Gaya | Aurangabad | Plan | |
343
| Construction of (5x16.50) H.L R.C.C Bridge in 1st KM of Tapua link road of Shivnarayanpur – Khawashpur Via Budhuchak in the District of Bhagalpur. Bhabesh Mishra Construction Pvt. Ltd. Ishaqchak bhagalpur. | Non-Mega | Work Circle-2 | Bhagalpur | Bhagalpur | Plan | |
344
| Construction of H.L. RCC Bridge Span (3x18.75) located over Dudhinalla between Nauhatta-Siyaidah-Bhagwanpur Road Nauhatta Block in Rohtas District. | Non-Mega | Work Circle-1 | Ara | Rohtas | Nabard RWD | |
345
| Construction of High Level RCC Bridge (7x18.00m) Size in 9th km of Manjhay-Govindpur Road in District of Nawada. M/s Vinay Construction Mob.- 9113385597/9431262097 | Non-Mega | Work Circle-2 | Nalanda | Nawada | Plan | |
346
| Construction of H.L., R.C.C. Bridge with its approach road at Baireya Panchayat in the road of Baireya Manch to Magurar village in the district of Supaul | Non-Mega | Work Circle-2 | External Project Division | Supaul | WBP Phase-2 | N/A |
347
| Construction of HL RCC Bridge (11x36.64m) in km 178 of NH-333A (Banka-Dhaka more) over river Chanan in Banka District. RAJBIR CONSTRUCTION PVT.LTD., 614 , HARIOM TOWER COMMERCIAL COMPLEX, CIRCULAR ROAD,LALPUR , RANCHI JHARKHAND. | Non-Mega | Work Circle-2 | Bhagalpur | Banka | Others | |
348
| Construction of H.L. R.C.C. Bridge (1 x 16.0M) with Approach Road at 3.70 K.M. of Makhdumpur-Sonwan-Hulasganj Road in the District of Jehanabad (Sunny Contractors and Engineers Pvt. Ltd., Patna Mob. No.-9771447801) | Non-Mega | Work Circle-1 | Gaya | Jehanabad | Nabard | N/A |
349
| Repair of Damaged Pile foundation (P11 to A2) of High Level RCC Bridge Upon Sakri River in Warshaliganj-kaharat Road near Dariyapur village in the District of Nawada. Sri Ram Mahavir Constructions Private Limited, Lakhisarai Mob No.-8809697946,7481827357 | Non-Mega | Work Circle-2 | Nalanda | Nawada | Non-Plan | N/A |
350
| Construction of HL RCC Bridge with extra water way over River Gandak including Approach Road, River Training Works & Protection Works in 27th km of Chakia-Kesaria-Sattarghat Road in Kesaria Block of East Champaran District | Mega | Work Circle-1 | Champaran(Motihari) | East Champaran(Motihari) | Nabard RCD | |
351
| Construction of H.L. R.C.C. Bridge (5x12.00m) on 1st Km. of Lauriya - Sikarpur-Thori Road. | Non-Mega | Work Circle-1 | Champaran(Motihari) | East Champaran(Motihari) | FDR | N/A |
352
| Construction of (2x16.0M) H.L.RCC Bridge at 3rd K.M of Nasriganj Bazar in Dehri-on-Sone in the District of Rohtas | Non-Mega | Work Circle-1 | Ara | Rohtas | Nabard RCD | |
353
| Construction of Multi Cell Box Culvert of Size (3x6.00x4.350) in place of damage old bridge (between Pkg-15 (Phase-1) & Pkg-27/1st Cutting (Phase-2) of Sonewarsa-Gwalpara road in the district of Saharsa. (Package No.-45) | Non-Mega | Work Circle-2 | External Project Division | Saharsa | WBP Phase-2 | N/A |