Your browser does not support JavaScript !


Click on Tender Number of any of the tenders to view these tenders. For old tenders, click here to visit the archives.

Tenders of Bihar Rajya Pul Nirman Nigam Ltd.
Search by Tender Number:
SLTender NumberTender DescriptionsExpiry Date
1 BRPNNL/NAL/1240 Consultancy Service for Authority's Engineer for Supervision of Construction of Greenfield 4-Lane Highway (Tourist way of Rajgir connecting Buddhist Circuit) from Salepur to Rajgir at NH-82 via Noorsarai - Ahiyapur - Silao in Nalanda District of Bihar
17-09-2025
2 BRPNNL/PAT1/1473 Construction of All weather indoor system alongwith supply & installation of Heat Pumps for Swimming Pool (50x25m) Situated Beside IAS Bhawan near Patna Airport in District of Patna.
18-09-2025
3 BRPNNL/KAT/1793 Construction and improvement Bypass Road with 01 No ROB from Bhutaha More (NH-107 in Km-171) to Millia Polytechnic College (SH-60 in Km 4th via Purnea-Srinagar Road from Ch.-0+000 to 9+176 (Total Length -9.176 km on Engineering, Procurement & Construction (EPC) Mode.
24-09-2025
4 BRPNNL/ARA/1032 Widening and Improvement to 4-Lane from Zero Mile to Asni Flyover (Left out of NH-30 ) including Construction of 2-Lane ROB with viaduct on EPC Mode in District Bhojpur (Ara), Bihar.
26-09-2025
5 BRPNNL/MZF/C029/1075 सीतामढ़ी जिलान्तर्गत रसलपुर- बाजपट्टी-गाढ़ा पथ के 20वें कि0मी0 में 3X14.00 मी0 आकार का उच्चस्तरीय आर0सी0सी0 पुल एवं पहुँच पथ निर्माण कार्य।
26-09-2025
6 1104/ MUZAFFARPUR/EPC/2025-26 Construction of H.L.R.C.C. Bridge(Total Length 2280 meter)over River Gandak with other Major Bridgesinapproach roadbetween Fatehabad in Paroo block &Chanchaliya in Saraiya Block in the district of Muzaffarpur.
27-09-2025
7 BRPNNL/DAR/1371 Construction of 2-Lane road with paved shoulder oftotal length25.825 Km of Madhubani Ring Road fromKanakpur (NH-27) to Jagatpur(NH-527A)(Western part of Ring Road, length-20.075 Km) and Birsar to Gangapur (Southern part of Ring Road, length 5.750 KM) with ROB in district of Madhubani.
27-09-2025
8 BRPNNL/NAL/1362 Development of Existing Road (additional 2 Lane) Salepur-Narsanda-Telmar-Karouta (Up to Jn. with NH-30 in km 224) of Length 19.43km from 2 Lane with paved shoulder to 4 Lane.
16-10-2025
9 BRPNNL/SRN/738 Construction of 2-Lane Road with Paved Shoulder for Mirganj Bypass Ch. 0.000 Km to Ch. 3.180 Km. (Total length- Approx 3.180 Km) consisting ROB and Trumpet/ Minor Bridges/ Culverts as required on EPC mode in the District of Gopalganj, Bihar.
21-10-2025